Estimate the total volume in thousand board feet of board

Assignment Help Civil Engineering
Reference no: EM131018139

For a location in Oshkosh, WI, estimate the total volume, in thousand board feet (MBF), for 100 pieces of 2" x 8", 16-feet-long board by using CostWorks.

Submission Requirements:

Submit the CostWorks format, including all the data and calculations used to estimate the total volume of board.

Reference no: EM131018139

Questions Cloud

Calculate the consumer and producer surplus : Calculate equilibrium price, quantity, consumer surplus and domestic producer surplus. Now imagine this country opens to free trade and the world price of steel is $500 per ton. Under free trade, calculate the consumer and (domestic) producer surp..
Estimate the bare cost of the diesel generator : Submit the CostWorks format, including all the data and calculations used to estimate the bare cost of the diesel generator.
Estimate the cost of the structural fill : Submit the CostWorks format, including all the data and calculations used to estimate the cost of the structural fill.
What will happen to the yield on 10 year treasury bonds : What interest rate would the bank have to charge to earn an expected rate of return on its loan equal to the T-bill rate - what would this indicate about investors expectations of future short term interest rates?
Estimate the total volume in thousand board feet of board : For a location in Oshkosh, WI, estimate the total volume, in thousand board feet (MBF), for 100 pieces of 2" x 8", 16-feet-long board by using CostWorks.
What is the anticipated price of eggs : Remember to show all of your work. Also remember that calculators are not permitted on exams, so you should try these by hand. Egg economists forecast that egg prices will rise 20% from 2012 to 2014. What is the anticipated price of eggs in 2014
Identify the genus and species of an unknown bacterium : Many bacteria appear identical to others when examined under a microscope, so a microbiologist uses characteristics of bacteria to narrow down the possibilities to eventually identify the genus and species of an unknown bacterium.
Graph the demand and supply curve in market : Graph the demand and supply curve in market for lift tickets - Find the equilibrium price and quantity for lift tickets, and also label these values on your graph.
Draw in a new supply curve on the above given graph : The figure below represents the market for a good that initially is in equilibrium at PO and QO. Draw in a new supply curve on the above graph, and label it ST

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Find the minimum speed at which the train could pass over

Steam locomotives require water at such rates that the storage tank behind the locomotive was refilled at 100 mile interverals. one technique used was to place a long tank between the rails and the water the water would be scooped up as the locomotiv..

  What rate of return per year will investor make over period

An investor has invested $250,000 in a new rental property. Her estimated annual costas are $6,000 and annual revenues are $20,000. What rate of return per year will the investor make over a 30-year period ignoring the salvage value

  Draw the iron-carbon phase diagram

Draw the iron-carbon phase diagram?

  What is the steady-state concentration of salt in the tank

Determine A_x and A_y, joint A's reaction forces' magnitudes in the x and y directions, respectively, and C_y, joint C's reaction force's magnitude in the y direction.

  Design a curve for the highway by computing the radius

The PI is at station 250+50, the design speed is 65mi/h, and a maximum superelevation of 0.07 ft/ft is to be used. If the central angle of the curve is 38 degrees, design a curve for the highway by computing the radius and stationing of PC and PT.

  How large a sample must we take in order to be confident

how large a sample must we take in order to be a) 95% b) 90% c) 99 d) 99.73% confident that the error in the estimated mean lifetime will not exceed 20 hours.

  Compute data needed to stake the curve at 50 foot increments

Two Tangents intersect at a PI Station of 35+33.24 whose coordinates are N=10349.64 feet and E= 10436.79 feet. The Intersection angle (I) = 20°15'42" Right, and the azimuth of the back Tangent is 23°14'32". (This azimuth is from the PC to the PI.)

  Determine the largest load p that can be supported

A log that is 2 ft in diameter is to be cut into a rectangular section for use as a simply supported beam. The material is wood select structural grade (Douglas Fir) with a specific gravity of 0.017 lb/in3.

  Uva levels in raw and treated drinking water

My question is regarding UVA levels in raw and treated drinking water with regard to TOC and DOC removal. Is there a jar test procedure that incorporates the UVA values of the various stages of treatment and is there a document you could refer me ..

  Calculate the monthly loan payment to repay a home loan

Banks typically offer 15-,20-, and 30- year loans. a) Calculate the monthly loan payment to repay a $100,000 home loan at 7% ARP over 30 years.

  Determine the deflection at the mid span of a simple beam

Determine the deflection at the mid span of a simple beam (wood joist) of a row house. The joist is designed as 2x12@16'' for DL = 12psf and LL=40 psf. The span length of the joist is 18'

  Calculate the mean fragmentation size using kuz ram

The mine wants to change the hole diameter to 229 mm and needs a new drilling pattern that will not result in coarser fragmentation. For this exercise you can assume homogenous geology and no adverse effects due to geological structure.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd