Estimate the rate of change in the water surface elevation

Assignment Help Civil Engineering
Reference no: EM13313198

The river flow at an upstream gauging station is measured to be 1500 m3/s, and at another gauging station 3 km downstream, the discharge is measured to be 750 m3/s at the same instant of time. If the river channel is uniform with a width of 300 m, estimate the rate of change in the water surface elevation in meters per hour. Is it rising or falling?

Reference no: EM13313198

Questions Cloud

Plot the shape of the water surface from the center : a whirlpool is modeled as the combination of a free and a forced vortex. the maximum velocity in the whirlpool is 10 m/s, and the radius at the juncture of the free and the forced vortex is 10m.
Calculate the force acting on a window facing the storm : the wind reaches a speed of 27.8 m/s in a storm. calculate the force acting on a 1m x 2m window facing the storm. the window is in a high-rise building. the air density p= 1.2 kg/m3.
What is your effective borrowing rate : Suggest a strategy for borrowing the $100 million. What is your effective borrowing rate?
Find what is the angular misclosure of the link traverse : The azimuth from station A of a link traverse to an azimuth mark is 212o 12' 36". The azimuth from the last station of the traverse to an azimuth mark is 192o 12' 15". Angles to the right are observed at each station
Estimate the rate of change in the water surface elevation : The river flow at an upstream gauging station is measured to be 1500 m3/s, and at another gauging station 3 km downstream, the discharge is measured to be 750 m3/s at the same instant of time.
Determining financial strategies to sustain investor : Write a paper of determining financial strategies to sustain investor relations.
Determine the amount of heat that must be transferred : Heat is transferred to the water such that the temperature in the tank remains constant. Determine the amount of heat that must be transferred by the time one half of the total mass has been withdrawn.
Explain the major product of the acid-catalyzed dehydration : The major product of the acid-catalyzed dehydration of of neopentyl alcohol (2,2-dimethyl-1-propanl) has a different carbon skeleton than that of the starting alcohol. suggest a structure for this alkene, and propse a reasonable mechanism for its ..
What is the maximum horizontal pull : A 10. kg blocks rests on a table (on Earth) and 0.50 is the coefficient of static friction. what is the maximum horizontal pull that will not move the block

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Determine maximum amount fabco should be willing to pay

Fabco, Inc., is considering purchasing flow valves that will reduce annual operating costs by $10,000 per year for the next 12 years. Fabco's MARR is 7 percent/year. Using an internal rate of return approach

  What will be discharge delivered from the upper reservoir

A reservoir at elevation 700 ft will supply a second reservoir at elevation 460 ft. The reservoirs are connected by 1300 ft of 24-in cast-iron pipe and 2000 ft of 20-in cast iron pipe in series. What will be the discharge delivered from the upper ..

  Determine what is the design volume of the aeration basin

Assume the microorganisms are 55 percent efficient at converting food to biomass, the organisms have a first-order death rate constant of 0.05/day, and the microbes reach half of their maximum growth rate when the BOD5 concentration is 10 mg/L

  Runoff rate into the inlet grate

If the detention storage on the paved section is increasing at the rate of 60 m3/hr, what is the runoff rate into the inlet grate?

  Determine what should be the removal efficiency

The regulatory agency has told the company to maintain a salt level pf no greater then 250 mg/L downstream of the discharge. what should the removal efficiency. (percentage of the salt removed) of a process designed to remove salt from the waste w..

  Determine what is the weight of the rock on the moon

A person on the moon wishes to determine the mass of a rock. He has a spring scale calibrated to read pounds mass at a location where the acceleration of gravity is 32.186 ft/s 2 . The rock gives a reading of 18.76 on this scale.

  How high can students climb just before the pole buckles

Assuming the center of gravity of the student aligns with the axis of the pole and the pole has an elastic behabior, how high can they climb (in meters, m) just before the pole buckles

  What is fluid viscosity at the torque on the inner cylinder

Only the inner cylinder is rotating. THe velocity distribution is given by V(r)=1000r-0.4/r [m/s]. If the diameters of the cylinders are 3 cm and 5 cm, respectively

  Determine the practical moment strength phi-msubn for steel

determine the practical moment strength phi x Msubn for a rectangular reinforced concrete cross section having a width (b of 13 in.) and an effective depth (d of 24 in.) The tension reinforcing steel is four no# 8 bars.

  Compute the change in volume of water stored over one year

Annual rainfall over the watershed is 36 inches and the annual runoff from the catchment is 12 inches. Evaporation from the reservoir averages 40 inches per year. The municipal water demand equals 100 million gallons per day

  Determine the safe load the column can carry using method

A column of dimensions 200 X 300 mm has an effective length of 3m. It is reinforced with 6 HYSD bars of 20mm diameter. Determine the safe load the column can carry using working method of design. Using M20 Concrete.

  Determine storage 1hour later if the average rates are given

The storage in a rectangular section irrigation channel is 20,000 m2 at a given time. Determine the storage 1 hour later if the average rates of inflow and outflow during the hour are 23 and 18 m3/s respectively.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd