Assessment Task - High Level Project Cost EstimateProject: Construction of Carbon Revolution Building

1. BACKGROUND Introduction

You are members of the Capital Projects Team of Facility Services Department at Deakin University who are assigned to undertake work encompassing a high level estimate of building cost of the Structural Works for the Carbon Revolution Building 2, located in the Waurn Ponds campus of Deakin University.

2. THE DESIGN BRIEF & SCOPE

The work for this project is to be advertised for tender in the near future. To date, some of the design drawings have been completed. For this stage, a high level cost estimate is required for the owner estimate of the cost of the project. The following scope of work has been assigned for the high level project cost estimate.

- The site location is as indicated (Appendix A)
- The design drawings are provided (Appendix B)
- Additional drawings may be released during the design progress
- The cost estimate is only for foundation and structure of the building
- The Bill of Quantities is to be completed (Appendix C)
- The cost of work is to be estimated based on published construction rates (e.g.
Rawlinsons Construction Handbook, Cordell Building Cost Guide, Aust. Institute of Quantity Surveyors, etc.)
- Any assumptions, notes or disclaimers regarding your cost estimate should be documented in your Assessment 1 report submission and in your Journal Diary

You may insert additional rows under ‘D. MISCELLANEOUS' section for other costs you can identify from the drawings, as well as providing some brief details on each of these additional items.

3. CONDUCT OF WORK
The Deakin University rules and regulations apply to this work.

4. SITE INSPECTIONS
At this stage, site inspections are not required. Employees may use satellite image to acquaint themselves with the site where any work is to be undertaken. Refer to Appendix A.

5. EXTENT OF WORK
A. The overall works to be undertaken includes:
- Undertaking high-level (rough) estimate of works quantity based on provided design drawings of the project
- Undertaking research on the unit rates (unit price) to conduct construction works for the project
- Provision of completed Bill of Quantities with prices
- Clearly specifying the source of data and additional information about justification as required, conditions, inclusions or limitation of the rates
B. This Assessment should be submitted as a group report.
C. A table indicating group members' contribution to the works should be submitted with the report.
D. Only 1 report per group is to be submitted via CloudDeakin.
E. Groups will be allocated in Week 1 Seminars or via CloudDeakin for off-campus students.

Reference no: EM131143312

Questions Cloud

Why is important for entrepreneur focus in staying positive : "If you can't compete in a marketplace, create a new marketplace." Why is this important for the entrepreneur's focus in staying positive? How does the concept of "pit bull mentality" tie to the chapter's emphasis on a positive work culture?
The outsourcing strategies : Western companies have become keenly aware that the outsourcing strategies in the past 20 years have created unintended consequences. Recent studies point out, as western companies outsource manufacturing to emerging economies such as China, Brazil, ..
Find the volume of the solid obtained by rotating : Use the method cylindrical shells to find the volume V of the solid obtained by rotating the region bounded by the given curves about x-axis
Determine the allowable load p for the given values of r : Write a computer program to determine the allowable load P for the given values of r, D, the thickness t of the bar, and the allowable stress σall of the material. Knowing that t = 1/4 in., D = 3.0 in. and σall = 16 ksi, determine the allowable lo..
Estimate of building cost of the structural works : Estimate of building cost of the Structural Works for the Carbon Revolution Building - You are members of the Capital Projects Team of Facility Services Department
What responsibilities does an employer have to ensure a safe : Within your post, support your responses with information from at least one peer-reviewed/scholarly source (not older than 3-5 years) from the Internet, and provide the full citation at the end. Use APA guidelines to format references. What respo..
Discuss how you will use the lessons learned : Discuss how you will use the lessons learned in your BBA program to be more productive in your current (or future) career. Provide specific examples to support your response.
Contractor has been selected to build new leisure centre : A contractor has been selected to build the new leisure centre. Describe the key controls you would expect to see in place to manage the contract and explain how internal audit can provide assurance over the effectiveness of those controls.
Create metaphor or analogy : Summation" Please respond to the following: Create a metaphor or analogy that captures the essence of the major lessons learned in the BBA program

Reviews

Write a Review

Other Engineering Questions & Answers

  The north american court system related problem

What would be your ideal situation if you are the prosecuting attorney?

  Determine the stiffness matrix

What are the two matrix methods used for analysis of skeletal structures - Define a statically indeterminate structure. What is meant by the degree of statical indeterminacy?

  Define the components of chemical processing plant in msr

What are the main problems of SMART SMR? Define the components of "Chemical Processing Plant" in MSR? How can SCWR achieve thermal efficiency (>40%) comparing to a PWR's efficiency

  Expected waiting time in the queue increases

Consider an M/M/1 queueing system. If the arrival rate increases, then the expected waiting time in the queue increases. Yes or No? Explain.

  Determine the minimum surge tank size

Assignment- Open Channel and Pipeline Flow: Determine the minimum surge tank size (nearest ½ m) to satisfy the max. allowable height. For the case of complete closure (Q changes from 15 + N1 m3/s to Q = 0)

  Natural resourse managemnt the topic will be fresh water

the topic will be fresh water and i need the assignment to b highly proffesional.all the details attatched in

  Estimate the total memory capacity

For a DRAM available for regular use 98% of the time, having a row-to-column ratio of 2 to 1, a cycle time of 10 ns, and a refresh cycle of 10 ms, estimate the total memory capacity.

  Determine period of the resulting vibrations

Knowing that the system is in equilibrium when bar AB is vertical and that collar A is given a small displacement and released, determine the period of the resultingvibrations.

  Ethics and professionalism in the engineering

1. The question of ethic as it applies to software distribution in markets other than the United States. 2. Programs with built in "back doors" and special features unknown to the user.

  Summarize the sensory pathways to the brain for gustatory

Summarize the sensory pathways to the brain for gustatory and olfactory sensations.Analyze and describe the process of hearing from the external to inner ear.Analyze and describe how the ear provides equilibrium and balance for the body.

  Provide passing sight distance for a 60-mi/h design speed

Is this curve long enough to provide passing sight distance for a 60-mi/h design speed?

  Recommend condensing the refrigerant

In a refrigeration system, would you recommend condensing the refrigerant-134a at a pressure of 0.7 or 1.0 MPa if heat is to be rejected to a cooling medium at 15°C? Why?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd