Estimate amount leached from concrete during one-year period

Assignment Help Civil Engineering
Reference no: EM13318531

Estimate the amount of Ca(OH)2(s) leached from concrete during a one-year period by precipitation. Assume that the area receives 40 in/yr of precipitation which is in equilibrium with PCO2= 10^-3.5 atm and [SO42-] = 10^-4 M. Assume that: a. The rain and concrete reach equilibrium rapidly. b. The remaining chemistry of the concrete does not impact leaching of Ca(OH)2(s). c. Within the concrete, assume a closedsystem with CT in solution equal to that in the incoming precipitation.

Reference no: EM13318531

Questions Cloud

Calculate the maximum charge on the capacitor : An uncharged capacitor and a resistor are connected in series to a source of EMF. If E = 3.63 V, C = 19.6 uF, and R = 119 ohm, Calculate the maximum charge on the capacitor
Estimate the mass of rust formation for rebar during a year : Estimate the amount of Ca(OH)2(s) leached from concrete during a one-year period by precipitation. Assume that the area receives 40 in/yr of precipitation which is in equilibrium with PCO2= 10^-3.5 atm and [SO42-] = 10^-4 M
Ownership is taxed differently from the others : Which of the following forms of ownership is taxed differently from the others
What is the radius of curvature of the turn : A 5600 kg mass car is taking a turn at 72 m/s. If the frictional force here is 44,000N, what is the radius of curvature of the turn
Estimate amount leached from concrete during one-year period : Estimate the amount of Ca(OH)2(s) leached from concrete during a one-year period by precipitation. Assume that the area receives 40 in/yr of precipitation which is in equilibrium with PCO2= 10^-3.5 atm and [SO42-] = 10^-4 M.
Determining the rate of return used to value a business : Which of the following factors plays a role in determining the rate of return used to value a business using one of the earnings approaches?
How much energy will it take to melt the core : In a serious accident, a nuclear power plant%u2019s reactor vessel cracks, and all of the cooling water drains out. how much energy will it take to melt the core
Find x-y and z coordinates of point b for radial readings : calculate the X, Y and Z coordinates of point B for radial readings taken to B from occupied station A, if the backsight azimuth at A is 25°32'48", the elevation of A = 610.098 m, and hi = 1.45 m.
Find the average power output by the man : A man pushes a 50N box across a level floor at a constant speed of 2.0 m/s for 10 s. Find the average power output by the man

Reviews

Write a Review

Civil Engineering Questions & Answers

  Ompare the ratio of kinetic energy to the potential energy

If a unit mass of groundwater accelerates from rest to an average linear velocity of 1 m per year and climbs a vertical distance of 1 m, compare the ratio of kinetic energy to the potential energy of the unit of groundwater.

  Determine the speed of the car at o at constant speed

A car traveling over a hill at constant speed starts to lose contact with the ground at O. If the radius of curvature of the hill is 85 m, determine the speed of the car at O.

  Calculate the relative compaction

A dam project specifies 97% compaction. Lab tests on the soil being used indicate that it has a maximum dry density of 1900 kg/m3 at an optimum water content of 13.2%. Field tests give the following results: Field dry density is 1790 kg/m3 and 16...

  Estimate the pressure change over 80 m of pipeline

Water at 20ºC flows at a velocity of 2 m/s in a 200-mm diameter horizontal ductile-iron pipe. a) Estimate the friction factor in the pipe, and state whether the pipe is hydraulically smooth or rough.

  Compare streamline with the streakline through the origin

A velocity field is given by V = xi + x(x-1)(y-1)j, where u and v are in feet. Plot the streamline that passes through x = 0 and y = 0. Compare this streamline with the streakline through the origin.

  Determine the critical load of a round wooden dowel

Determine the critical load of a round wooden dowel that is 0.9m long and has a diameter of (a) 10mm (b) 15mm. Use E=12GPa

  Determine the velocity and acceleration of point b

The velocity of the center point of the wheel is constant at 20 ft/sec to the right. For the instant, determine the following: a) The velocity and acceleration of point B (which is attached to the wheel) measured with respect to ground.

  Determine how high was the buckle into an isosceles triangle

They completed the installation when the temperature was 20 degrees Celsius. When the temperature rose to 25 degrees Celsius, the rail buckled into an isosceles triangle because they had not left an expansion gap.

  Determine the moment about each of the coordinate axes

knowing the tension in cable AC is 1065 N, determine the moment about each of the coordinate axes of the force exerted on the plate at C

  How much does she get to keep after paying off the loan

A year after buying her car, Anita has been offered a job in Europe. Her car loan is for $15,000 at a 9% nominal interest rate for 60 months. If she can sell the car for $12,000, how much does she get to keep after paying off the loan

  Estimate the minimum do and the critical location in river

If the ultimate BOD of the mixed river water is 30mg/L, the rate constant for BOD at 20ºC is 0.6d-1, the reaeration rate constant at 20ºC is 0.8d-1, and the removal of BOD by sedimentation can be neglected

  Would stainless screen have sufficient collapse strength

The saturated unit weight (sat) of the sand is 20.0 kN/m3 and the anticipated depth to water in the well during pumping is 20 m below ground surface.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd