International Door Slammers has an order to deliver 500 door slammers on day 130. Draw up a backward schedule under the following conditions:
a. Only one machine is assigned to each operation.
b. Schedule one 8-hour shift per day for 5 days per week.
c. All parts are to move in one lot of 500 pieces.
d. Allow 8 hours between operations for queue and move times
A slammer consists of three parts. Purchased components C and D form subassembly A. Subassembly A and component B form the final assembly. Part B is machined in three operations. No special tooling is required except for part B, operation 20. It takes 24 hours to make the tooling. Material is available for all parts.
Standard times for the lot of 500 are as follows:
An oil storage area abandoned 19 yrs ago had oil spilled on the ground and saturated the soil at a concentration of 400mg/kg of soil. A recent soil sample shows a concentration of 20mg/kg.
Discuss the effects of stacking fault energy on the deformation of a ductile solid
Explain what is all about hydrated cement
If you place $600 from your first paycheck into a Roth IRA earning 4.00 percent annual interest, how much will it be worth when you withdraw it in 40 years
a two stage high rate trickling plant is to treat a municipal wastewater having a flow of 2.0mgd. pertinent data: influent BOD5 = 200mg/l, BOD5 removal by primary clarifier = 33%, filter bed depth = 5 to 7ft
Take the heat of vaporization of water to be 2430 kJ/kg.
The mass of the mower and attached bag is 50 kg with center of mass at G. Assume that the operator does not push on the handle, so tha P = 0.
concrete weights 23.5 knm3 and water weights 9790 nm3. coefficient of friction between the dam and foundation is 0.55.
Measure the horizontal distance lengths of traverse legs using pacing, surveyor's tape and total station - familiarise with the use of GPS to measure coordinates and other computations (i.e. Slope and horizontal distances, area, perimeters etc.)
A coal mine's entry and breakthrough centers are set at 60ft with 20ft-wide openings. The 6ft coal seam lies 1,000ft below the suface, and the specific gravity of the overburden is 2.4. If the compressive strength of 4in.
If an alternative base material is available for $5,791.50 per lane-mile per inch depth, to use it, the minimum depth for asphalt has to be increase to 6 inch with no change of base and subbasedepth. What will be the total cost per lane-mile per i..
In Example 14.10, if we switch the transformation functions between the red function and the green function, what is the expected color for the area pointed to by the arrow, and what is the expected background color?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd