Differentiating characteristics of projects from routine

Assignment Help Project Management
Reference no: EM13313943

As an adult student, believe it or not, your career goals can be viewed as a project. Remember from the text that a project is a complex, non-routine, one-time effort limited by time, budget, resource, and specifications. Differentiating characteristics of projects from routine, repetitive daily work are below:

a. A defined life span
b. A well-defined objective
c. Typically involves people from several disciplines
d. A project life cycle
e. Specific time, cost, and performance requirements.

With this in mind, for this course you will create a comprehensive career project for the next 5 to 10 years.

• Define key deliverables and workflow, along with roles/responsibilities for their realization
• Work out a benefits realization strategy for post-project confirmation that benefits are being accrued
• In APA format with Introduction, Conclusion and proper references/citations.

 Where do I see myself in 5 years? Hopefully, in a position where I can make critical decisions for a company I work for or my own business. In a position of authority such as manager, director, or perhaps VP or CEO of the company, who know since this is my career project.

Verified Expert

Reference no: EM13313943

Questions Cloud

Explain the solution and allowed to dissolve : A sample of 0.05567 mole sodium acetate was dissolved into 150.0 mL of water. If 2.00g of NaOH(s) was added to the solution and allowed to dissolve
Discuss your company of expertise : Discuss your Company Of Expertise
How many excited states are there : Use the semi-infinite-well potential to model a deuteron, a nucleus consisting of a neutron and a proton. How many excited states are there
Determine what would the deflection be at the right end : A 2-inch by 2-inch solid steel beam (18 inches long) is fixed to the wall at the left to resist applied moment (20,000 lbs-inch). What would the deflection be at the right end Up or down
Differentiating characteristics of projects from routine : Define key deliverables and workflow, along with roles/responsibilities for their realization and work out a benefits realization strategy for post-project confirmation that benefits are being accrued
Determine the maximum force that can safely applied : Determine the maximum force (P) that can safely applied to a steel tee section (20 feet in length) with the point loads at 5 feet from each end. Fixed at one end, pin at the other.
At what speed will the crewman hit the bottom of the ravine : If we assume the ice is perfectly slick (that is, no friction between the crewman and the ice once he slips and falls down), At what speed will the crewman hit the bottom of the ravine
Define a function named average grade : Define a function named average grade. This function returns a double and has four double arguments, testi, test2, test3, test4. The return value should be the average, or arithmetic mean of the four arguments.
Determine the displacement of the beam at each end : A rigid beam (AB), 12 feet in length, with a point load of 9 kips (4 feet from A) is resting on two short steel rods (AC & BD). Diameter of Rod AC is 1 inch, Rod BD diameter is 2 inches.

Reviews

Write a Review

Project Management Questions & Answers

  Talk about fragmentary identities

Social psychologists and even sociologists a lot of times talk about fragmentary identities that exist in people bicultural people.

  Main reasons for it project failure

What are the main reasons for IT project failure? What is the most important thing that management can do to increase the likelihood of IT project success?

  Determine the short-term and long-term goals

COOKIE PROJECT - Determine the short-term and long-term goals of the company and determine cookie specifications: cookie quality, size, appearance, special features (types of chips, nuts, etc.), quantity, and packaging.

  Explain conflict in project management

Explain conflict in project management and how to manage constant stress - explain how conflict is synonymous with project management.

  Role of pert, cpm and gantt in project management

Show the role of PERT, CPM and Gantt in Project Management -  Identify the purpose of each tool and circumstances for using each.

  Sequence of activities for completing the project

The time to complete a project may be shown in a chart; however, the sequence of activities for completing the project may not be shown in a chart.

  Show the cost and time methods

Cost and Time Methods - As a project manager, show the cost and time methods you would chose to work with and why you believe these are the best.

  Reviewing the balanced scorecard approach

Reviewing the balanced scorecard approach of Youngblood and Collins.

  Specify the performance criteria for the project

Project Performance: List the desired outputs from the project and specify the performance criteria for the project.

  Projects include risk in project planning

Why should all projects include risk in their project planning? What are some of the drawbacks if risks are not considered?

  Describe why you believe barrier is challenging

Describe why you believe this barrier is challenging for organizations as well as what you would do to overcome it, if you were faced with change in your organization.

  Techniques for assessing project risk

Questionnaires and Surveys are well established techniques for assessing project risk

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd