Develop an overall work breakdown structure for system

Assignment Help Computer Engineering
Reference no: EM131290717

Systems anlysis

You were first asked to select a system or software application to specify requirements, develop a design using modeling tools, formulate development and testing strategies, and propose an integration and deployment plan. Each week, you contributed with specifications and plans that culminated in an overall Key Assignment System Requirements, Design, and Implementation Specification as follows:

Part 1 Tasks

• System and Application Overview: An overview of the system or software application and intended users

• Requirements Specification: Detailed requirements specification with both functional and nonfunctional requirements

• System and Application Design: A high-level design in the form of use cases and detailed design models utilizing computer-aided software engineering (CASE) tools to represent the data, processes, and interfaces

• Test and Quality Assurance Plan: A test and quality assurance plan that included the various tests and quality control measures that need to be taken into consideration

• Development Strategy: A development strategy that weighs make versus buy or insourcing versus outsourcing acquisition strategies

Make any updates to the content based on feedback from your instructor and your peers. Make sure that the Key Assignment has a good flow and is cohesive in its presentation of information.

Part 2 Tasks

You are given the assignment to craft an integration and deployment plan for your selected application or system that includes the required resources and work breakdown structure of implementation tasks (you may use Visio Software Application where needed).

The project deliverables are as follows:

• Update the System Requirements, Design, and Implementation Specification title page with the new date.
• Update the previously completed sections based on the instructor's and peers' review feedback.
• Integration and Deployment Plan
o Develop an overall work breakdown structure (WBS) for the 7 system development life cycle (SDLC) phases:

- Preliminary Analysis
- System Analysis or Requirements Definition
- System Design
- Development
- Integration and Testing
- Acceptance, Installation, and Deployment
- Operation Support and Maintenance

o Add activities under the first 5 phases that you already performed.
o Add activities that are specific to the final 2 phases in SDLC for deployment and ongoing maintenance and support.

• Name the document "yourname_IT425_IP5.doc."

Please submit your assignment.

For assistance with your assignment, please use your text, Web resources, and all course materials.

Reference no: EM131290717

Questions Cloud

Measurements of the key length dimension : The attached table contains the measurements of the key length dimension from a fuel injector. These samples of size five were taken at one-hour intervals.
Develop a proposal for each of the given approaches : Develop a proposal for each of these approaches: insourcing, outsourcing, and a combination of the two. Present the pros and cons or benefit analysis for each of the 3 proposals.
Calculate the net swap payment, indicating which party pays : If the stock index is at 1,275.89 on the first payment date, calculate the net swap payment, indicating which party pays it.
What would you recommend charles do now : 1. What would be the benefits of raising the $3 million through a private placement? What would be the benefits of raising the money through a venture capitalist? 2. Of these two approaches, which would be best for Charles? Why? 3. What would you r..
Develop an overall work breakdown structure for system : Develop an overall work breakdown structure (WBS) for the 7 system development life cycle (SDLC) phases: Preliminary Analysis, System Analysis or Requirements Definition and System Design.
Write a paper about the critical thinking : A brief statement and explanation of the theory/theorist's history, frame/type and what that means, and main principle should be included before applying it. When you apply the principle, you should weigh each option you identified in your analys..
Appeal for a venture capitalist : Would a commercial banker be willing to lend money to the Abramses? How much? On what do you base your answer? Would this venture have any appeal for a venture capitalist? Why or why not? If you were advising the Abramses, how would you recommend the..
How the two types of swaptions are like interest rate option : Explain how a bank could use a swaption to hedge the possibility that it will enter into a pay floating, receive-fixed swap at a later date ? Explain how a forward swap is like a swaption and how it is different .
Do you think the united states : In your own words. Do you think the United States is more or less likely to face another housing crisis similar to the one experienced in 2008? Explain. (At least 250 words)

Reviews

Write a Review

 

Computer Engineering Questions & Answers

  By testing example with different values for the inputs

The customers should come in at a steady rate by z number of seconds. There must be a max of customers that may come in as w.

  Questiona assume a computer has a maximum memory size of

questiona assume a computer has a maximum memory size of 4mb. what is essential address field width?b assume a computer

  Discuss idea that applications have to visually consistent

From the e-Activity, discuss the idea that all applications have to be visually consistent. Argue whether you agree or disagree with the idea and why.

  Question1 write down an sql statement to show tables owned

question1. write down an sql statement to show tables owned by user newyear. 2. write down an sql statement to show the

  Program requires to check the current disk drive and report

program requires to check the current disk drive and report.

  What are the serious challenges faced

What are the serious challenges faced when creating in-house software applications and what is the best process of training users on new software.

  You are required to compare and contrast the windows server

you are required to compare and contrast windows server 2003 r2 against windows server 2008 r2 in terms of the capacity

  In your paper examine the roles of communication and

prepare a 1050- to 1750- word paper in which you describe a negotiation situation that you have participated in e.g.

  What are two processes of conserving ip addresses

How are default subnet masks determined.What are two processes of conserving IP addresses? Explain these methods.

  Difference between the typed password and "phoenix"

explain difference between the typed password and "Phoenix".

  Computer architecture 1 give the register transfer notation

computer architecture 1 give the register transfer notation for a simple calculator which supports the operations -

  What is an accumulator

There are some instructions where the ALU and register_AC together will act as an accumulator. What is an accumulator. There are some instructions that do not require an output from the ALU. You can choose the output of the ALU in these cases. What ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd