Develop a project concept. Find a stakeholder who will act as sponsor for the project. Outline the business problem that the system is intended to address, and establish an initial business case for the system. Establish the overall scope of the system in broad terms.
Create an Initial Project Plan. This should be consistent with the UP methodology and indicate in very broad terms the development schedule you intend to follow.

Create an Iteration Plan (Inception Iteration 1 Plan - IIP1) that outlines the activities you will undertake in the next fortnight to get your project started. Read the steps listed in OpenUP: OpenUP Lifecycle: Inception Iteration: Initiate Project, and then outline the specific actions you will take in relation to your own project to achieve those steps. State the specific outcome of the action in terms of what artefact will be produced, or what change in an existing artefact will occur.

Also specify how long you expect each action will take. The project is expected to fit within normal unit workloads, so beware of specifying more than 10 hours of activities per week. In conjunction with the reading you are expected to perform, a total of 7-8 hours of planned activities will be sufficient. Don't pad your figures, and don't plan to do too much. Use the ‘Iteration Plan' template provided with the OpenUP website.

If you are involved in a group project make sure everyone has a task, and identify in the plan who is meant to do what.

Make sure you include work items for reviewing the current iteration, and planning the next iteration in the iteration plan. Allow an hour or two for these activities.

Remember that each work item must be associated with an artefact, and the outcome of the work activity must be measurable in terms of the state of the artefact.

Submit:

a) A project concept identifying the project sponsor and addressing the business problem and business case for the system.

b) An initial project plan.

c) A detailed iteration plan for the first Inception Iteration (IIP1).

Reference no: EM13333280

Questions Cloud

Determine what is length of kanwais cash conversion cycle : Kanwai fans produces 25,000 fans per day at a cost of $7.50 each (material and labor). It takes the firm 12 days to convert raw materials into a fan and sell ir
What is the velocity of the lighter ball before impact : Two balls of masses Ma= 45 g and Mb= 65 g, are suspended. The lighter ball is pulled away to a 66 degree angle with the vertical and released. What is the velocity of the lighter ball before impact
Compute the grams of o2 gas : Calculate the grams of O2 gas that will have the same volume as 300.0 g of N2 gas at 10 degrees C and 5 atm
What is the magnitude of the net gravitational force on mass : Three identical masses of 320kg each are placed on the x axis. One mass is at = -120cm , one is at the origin, What is the magnitude of the net gravitational force on the mass
Develop a project concept : Develop a project concept. Find a stakeholder who will act as sponsor for the project. Outline the business problem that the system is intended to address, and establish an initial business case for the system.
Evaluate the cost of the raw materials : Evaluate the cost of the raw materials used in production during the year and what is the total amount of the costs listed above that are not direct costs of the Brentwood Store?
Explain a typical mountain top air pressure : At sea level (1.00 atm), .500 moles of F2 gas will occupy 8.51 L of space at what temperature in C? What would the temperature of the system be at 650 mm Hg, a typical mountain top air pressure
Compute the distance in which snowmobile coasts to a halt : Under the influence of its drive force, a snowmobile is moving at a constant velocity along a horizontal patch of snow. compute the distance in which the snowmobile coasts to a halt
Explain what is the final temperature of the mixture : If 46.1 g Zn at 18.0 C is placed in 80.0 g H2O at 75.0 C, what is the final temperature of the mixture. The specific heat capacities of zinc and water are 0.388 J/g·K and 4.184 J/g·K, respectively.

Reviews

Write a Review

 

Project Management Questions & Answers

  The paybak criterion and which is the most desirable project

Which need an initial investment of $30,000 and provide cash inflows of $60,000 as shown below. This organization has a 15% cost of capital.

  What would the total annual costs be for the phoenix

What would the total annual costs be for the Phoenix location with an annual output of 10,000 units? $140,000 $220,000 $280,000 $300,000 $156,000

  What is the operating cash flow for project

Evaluate the operating cash flow for a project - What is the operating cash flow for this project

  Identifying the applicable decision concepts

Identify the applicable decision concepts (theories, principles, paradoxes, etc.) from our learning all semester (not just the group decision concepts identified in Unit 5) that your group believes.

  Write functions of project management software

What functions does project management software give that you can't do easily using other tools like a spreadsheet or database?

  Tools use to ensure projects are in control

What is meant by project control? What are some tools and mechanisms that we can utilize to ensure projects are in control?

  Prepare a project file for the project

Prepare a project file for the project and make any necessary changes to the Environment options and choose a calendar for the project

  Manager-s actions indirectly-directly affect experience

List 7 situations in which a manager's actions either indirectly or directly affect a guest's dining experience.

  Importance of a project kick-off meeting

Explain the importance of a project kick-off meeting, and what needs to be reviewed in that meeting.

  Organizations that actively promote project management

Show the list the organizations that actively promote project management, such as CompTIA and PRINCE2. Select two of the organizations and then describe the industry or market it serves, the scope of its membership, and the services it provides it..

  Entertainment - due to electrical code changes

All the equipment that bands bring to the stage will need to be checked by fire marshals

  Explain what challenges might the foreign managers face

Explain what challenges might the foreign managers face while communicating with the home base and justify your answer with examples and reasoning.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd