Determine what should be the magnitude of the load p2

Assignment Help Civil Engineering
Reference no: EM13296385

A hollow circular post ABC supports a load P1 = 1700 lb acting at the top. A second load P2 is uniformly distributed around the cap plate at B. The diameters and thicknesses of the upper and lower parts of the post are dAB= 1.25 in, tAB= 0.5 in, dBC= 2.25 in and tBC= .375 in respectively. A) Calculate the normal stress AB in the upper part of the post. B) If it is desired that the lower part of the post have the same compressive stress as the upper part, what should be the magnitude of the load P2? C) If P1 remains at 1700 lb and P2 is now set at 2260 lb, what new thickness of BC will result in the same compressive stress in both parts?

Reference no: EM13296385

What is the major head loss in a coarse concrete pipe with

What is the major head loss in a coarse concrete pipe with a diamter of 1ft that is 100 ft long. Water flows at a rate of 20 ft^3/s (viscosity of water = 2.344x10^-5 lbfs/ft^2

Estimate the average hourly average daily and minimum hour

Estimate the average hourly, average daily, and minimum hourly residential sewage flows from an area serving a population of 1500 people. Assume that the lenghth of sewer and

Determine the speed of the motorcyclist at the instant

While traveling around the curved path, the motorcyclist increases speed by 1.25ft/s^2 . Part A - Finding the time interval for the motorcyclist to reach a given acceleratio

Derive an expression for velocity of a jet of viscous liquid

Using pie method, derive an expression for the velocity of a jet of viscous liquid issuing from an ori ce under static head if this velocity depends only on head, ori ce di

How long will it take until the reading is say 22.8 degrees

Consider a lake whose fish population is governed by the equation: dP/dt= 0.1P[(P/10)-1] if the initial fish population is 3,000 and assuming no fishing is allowed in the lake

Constuct a choice table for interest rate from 0% to 100%

The owner of a downtown parking lot has employed a civil engineering consulting frim to advise him on the economic feasibility of constructing an office building on the site.

Plot horizontal component of velocity and dynamic pressure

A wave has a height of 1.5 m in water 5 m deep and a wave period of 6 s. Plot the horizontal component of velocity, the vertical component of acceleration, and the dynamic p

What is the maximum so2 discharge rate

An electric utility wants to build a new coal fired power plant in an urban setting. The regulatory agency has determined that in order for the plant to be permitted it must l

Reviews

Write a Review

 
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd