McDermott Technologies is evaluating a new project that requires $800,000 in new equipment. McDermott estimates that the new project will generate $900,000 in annual sales at the end of each of the next four years and that operating costs (excluding depreciation) will equal $400,000. Suppose the firm depreciates the equipment using the straight-line method over four years and the firm's tax rate is 40%. The project's WACC is 10.4%, what is the present value of te projects OCFs?

Reference no: EM13336001

Questions Cloud

Find the time for the flywheel to come to rest : A flywheel has a constant angular deceleration of 2.2 rad/s2. Find the time for the flywheel to come to rest
What is the equivalent annual annuity for each plane : Plane A has an expected life of 5 years, will cost $100 million and will produce net cash flows of $30 million per year. Plane B has a life of 10 years, will cost $132 million and will produce net cash flows of $27 million per year.
What is the resulting velocity of the player : Here's a basketball problem: A 75.0 kg basketball player is running in the positive direction at 8.2 m/s. what is the resulting velocity of the 75.0 kg player
Find the mass of this object : An object of unknown mass is attached to an ideal spring with force constant 150N/m and is found to vibrate with a frequency of 6.00Hz. Find the mass of this object
Determine what is the present value of the projects ocfs : McDermott estimates that the new project will generate $900,000 in annual sales at the end of each of the next four years and that operating costs (excluding depreciation) will equal $400,000.
Reflected in projected financial statements : How are planning assumptions reflected in projected financial statements? Is there a standard computational procedure for incorporating assumption into planned numbers? What’s the difference between simple, estimated plan and more complex, and precis..
Find total length of wire is required : A solenoid is designed to produce a magnetic field of 2.50×10?2T at its center. It has a radius of 1.60cm and a length of 31.0cm , What total length of wire is required
Find the magnetic permeability of this material : When a certain paramagnetic material is placed in an external magnetic field of 1.50T , The magnetic permeability of this material is
Contrast planning cash requirement : Contrast planning cash requirement, especially borrowing, using the statement of cash flows derived from forecast financial statement with a cash budget. Which is likely to be more useful in running a finance department?

Reviews

Write a Review

Financial Econometrics Questions & Answers

  What volume of procedures must group now perform

Assume that the practice must accept a 20% discount in order to stay competitive. What volume of procedures must they now perform in order to make the same profit they have been making

  Determine which type of loan does letitia have

Letitia borrowed $6,000 from her bank 2 years ago. The loan term is 4 years. Each year, she must repay the bank $1,500 plus the annual interest. Which type of loan does she have

  Determine what should be the yield to maturity of the bonds

joe's company's bonds have 10 years remaining to maturity. Interest is paid annually, the bonds have a $1000 par value, and the cooupon interest rate is 6%. the bonds have a yield to maturity of 9%.

  What will the after-tax cost of debt be when the loan is due

Tobin's BBQ has a bank loan at 8% interest and an after-tax cost of debt of 6%. What will the after-tax cost of debt be when the loan is due if a new loan is taken out yielding 11%

  What interest rate does bob jones need to make on a tax

What interest rate does Bob Jones need to make on a taxable investment to equal the 6% he can make on a tax free bond, assuming he is in the 40 percent tax bracket

  Construct the balance sheet for gcp at the close of business

Construct the balance sheet for GCP at the close of business on Day 31. Remember, the employee's salaries will have been paid at the beginnings of the day for the previous 15 days of salaries they have worked

  What is the discount yield and bond equivalent yield

What is the discount yield, bond equivalent yield, and effective annual return on a $1 million Treasury bill that currently sells at 93 3/8 percent of its face value and is 70 days from maturity

  Prepare schedule of cost of goods manufactured in good form

Baba Company is a manufacturing firm that uses job-order costing. The company's inventory balances were as follows at the beginning and end of the year: Beginning Balance Ending Balance Raw materials

  Determine what should happen to the supply of money

if there are no excess reserves in the banking system and $1 billion in new reserves are created by the federal reserve, what should happen to the supply of money

  Define difference between the highest and lowest estimates

You were asked to estimate the cost of equity based on the three most commonly used methods and then to indicate the difference between the highest and lowest of these estimates. What is that difference

  Determine what is the npv of installing the equipment

1) The equipment costs $250,000. 2) It costs $200,000 per year to operate. 3) It has an economic life of five years and is depreciated using the straight-line method.

  How much would state liability for each of families change

Analyze the implications of credit on two families of this state: Family #1 (in the 18 percent federal tax bracket) and Family #2 (in the 35 percent federal tax bracket), each family expends approximately $1,500 per year for child-care.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd