You have been asked to estimate the optimal size of a small reservoir that is being constructed near Atlanta. Knowing that water is a scarce commodity, you have decided to adopt an "economists" perspective on this problem, that is, you have decided to determine the size of the reservoir where net benefits are maximized and where marginal benefits equal marginal costs.Define "x" as the size of the reservoir in (acre-ft)/year. The total benefits and total costs of this reservoir can be estimated with the following equations:TB= (2*x) + (250*x^2) TC= (55*x) + (0.8* x^3)What is the optimal size of the reservoir?
For each of the horizons, provide a description of the soil characteristics and briefly describe the environment where you would expect to find the horizon?
At the end of 15 years, the first motor will have a salvage value of $50 and the second motor will have a salvage value of $100. consider the MARR to be 8%. (note : 1HP=0.7457 kw). Determine which motor should be installed based on the PW criterio..
What are the quantitative measures of reliability (discuss measures for hardware, software, personnel, facilities, and data)?
Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..
Compare and contrast the purpose and scope of the Federal Insecticide, Fungicide, and Rodenticide Act with the provisions of the Federal Food, Drug, and Cosmetic Act.
A young engineer has invented holographic mobile phones and has approached a venture capital company to invest in it. The venture capital company considers the product to be an all or nothing product
A stockpile of gravel that has a water content of 6% is rained on so that its water content increases to 9%. Compute the difference in the weights of dry gravel in a 10 ton truckload taken from the pile before and after the rain.
Determine the number of completely mixed bioreactors (detention time of 45 min each) that would be required to meet the phenol discharge limit of 5 mg/L. The first-order removal rate constant is equal to 6.1 hr -1
Determine the COD, carbonaceous BOD, and nitrogenous oxygen demand of a 100 mg/L solution of urea (N2H4CO)
A four- lane undivided multilane highway ( two lanes in each direction) has 11- ft lanes and 5- ft shoulders. At one point along the highway there is a 4% upgrade that is 0.62 mi long.
The volume of fill required is 2500 cubic meters. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill. (in cubic meters).
Assume that during the analyze stage an obvious solution is discovered. Should that solution be immediately implemented and the remaining steps of DMAIC abandoned?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd