Determine the value of trelease and acceleration of boxes

Assignment Help Civil Engineering
Reference no: EM13315003

Boxes are placed on a slope at uniform intervals of time trelease and slide down the slope with uniform acceleration. Knowing that as a box B is released, the preceding box A has slid 6 meters down the slope and that 1 second later they are 10 meters apart, determine the following: (a) The value of trelease (b) The acceleration of the boxes.

Reference no: EM13315003

Questions Cloud

Explain the mathematical expression for a standing wave : Use the principle of superposition and the boundary conditions for a stretched string with a fixed or free end to explain the form of reflected pulses. Explain and use the mathematical expression for a standing wave
Rate the consequences according to severity : Even where the specifications are defective, a contractor may not recover for a delay where the defects were patent. Describe a situation in which a contractor may have failed to alert the customer to defects and suggest reasons for this failure to c..
How to create a biological database based on viruses : How to decide which attribute should be there in the table and schema? How to identify the primary keys, foreign keys, domain, E-R diagram and 20 Queries on the same database.
Describe functional and nonfunctional requirements : Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
Determine the value of trelease and acceleration of boxes : Knowing that as a box B is released, the preceding box A has slid 6 meters down the slope and that 1 second later they are 10 meters apart, determine the following: (a) The value of trelease (b) The acceleration of the boxes.
What is the tension in the tierod : A student is standing on a ladder as shown in the figure to the right. Each leg of the ladder is 2.7 m long and is hidged at point C. What is the tension in the tierod
Calculate the gravitational force between earth and moon : calculate the gravitational force between the earth and the moon in newtons. the distance between the earth and the moon is 384x10^3
Population of each country is in the labour force : What are the similarities and differences between the three countries in terms of the percentage of the population that works in each type of industry?
What is the tension in the vertical wire : The system shown above is in equilibrium. The steel block has a mass m1 = 234 kg, What is the tension in the vertical wire that holds the steel block

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Illustrate and annotate the lever system

a wheel barrow is used to lift a 200lb load. the lenght from the wheel axle to the center of the load is 2ft. the length from the wheel and axle to the effort is 5 ft. illustrate and annotate the lever system.

  Determine the dimensions of the best hydraulic section

A semicircular open channel to be made of concrete is to be designed to carry 1.5 m^3/s at a slope of 0.00085. Manning's roughness coefficient is 0.015. Determine the dimensions of the best hydraulic section.

  Calculate the quality of the steam exiting heat exchanger

A chemical plant uses a tube-­within-­a-­tube counterflow heat exchanger to heat air with the use of steam. During steady state operation, the air flows into the exchanger at a rate of 5,000 kg/h and a temperature of 27C and exits at a temperature..

  Isotropic and homogenous hydraulic conductivity

Assuming an isotropic and homogenous hydraulic conductivity of 0.0001 cm/s what is the magnitude and direction of specific discharge (q)?

  Compute the shear modulus for the aluminum

The elastic portion of the tension stress-strain diagram for an aluminum alloy. The specimen used for the test has a gauge length of 2 in and a diameter of 0.5 in. When the applied load is 9 kips, the new diameter of the specimen is 0.49935 in.

  Determine the ratio of the mean velocity to the max velocity

velocities in a 200-mm-diameter circular conduit, measured at radii of 0,36,64, and 87 mm were 7.0, 6.8, 6.1, and 5.0 m/s, respectively. Find the approximate values (graphically) of the volume flow rate and the mean velocity.

  Determine specific surfaces in m2 per g units for the sphere

Determine the specific surfaces in m2/g units for the spheres of diameters (a) 10.0 cm, (b) 1.0 cm,(c) 0.1 cm, (d) 0.01 cm. (e) 0.001 cm and (f) 0.0001 cm. Assume the mass density of spheres as 2.5g/cc.

  What is the maximum horsepower that the system can produce

A ssume that one half of the energy incident on the collector goes to this reservoir, which, in turn, serves as a source for a heat engine. If the temperature of the atmosphere is 70 F,

  What are the concentrations of h2po4- and hpo42-

The total phosphate concentration (TOTPO4) in a river is 3.2 mg/L as P. The pH of the river is 7.8. What are the concentrations of H2PO4- and HPO42-

  Determine the value of po

Determine the value of Po, as a funciton of H, for these two investment alternatives to be equivalent at an interest rate of i=15% per year.

  Draw all aldehyde and ketone isomers of c6h12o

What is the reaction that occurs with hexanal and propanol (give both the hemiacetal and acetal products)?

  How much more flow in cfs will be attained with project

If a 96-inch brick sewer (n = 0.015) is laid on a slope of 0.01% is set to be rehabilitated with GIPL (n = 0.01) that will need 2-inches all around it. How much more flow, in cfs will be attained with this project

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd