Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The hollow tube assembly rotates about a vertical axis with angular velocity w = θ = 4 rad/s and red/s2 A small 0.2-kg slider P moves inside the horizontal tube portion under the control of the string which passes out the bottom of the assembly. If r = 0.8 m, and determine the tension T in the string and the horizontal force Fθ exerted on the slider by the tube.
a piston-and-cylinder device contains 5 kg of water initially at 150 C and 0.20 MPa. The frictionless piston is then pushed slowly in an isothermal process until the volume of water becomes 10% of its initial value.
A pump of 80% efficiency lifts water from one large open tank to another; the difference in water surface elevations is 20 feet. The pipe is relatively smooth (f = 0.0122), and has 3 elbows, each with a loss coefficient of 2/3.
Will all the mass fractions be identical? How about the mole fractions?
Draw A flow net. Show flow lines, flow Channels, and Equipotential lines. Using flow nets, please provide an estimate of seepage rate below the dam. Your submittal will provide the basis for an environmental impact statement regarding the construc..
Select the lightest W 14 shape that will support a live load of a 400 kips and a dead load of 75 kips for 20 feet tall column that is fixed at its top and bottom.
A 35 feet diameter oil storage tank is built on a 100 ft thick soil layer. The tank exerts an uniform pressure of 1000 pcf on the ground surface. The groundwater table is 10 ft below the ground surface.
A -2.8% grade line meets a +3.6% grade line at station 125+00 at elevation of 1631.04. Assuming a length of curve is 650feet, compute the elevation and station of the BVC (PVC) and the EVC (PVT).
Calculate the size of an anaerobic digester required to treat the sludge from a primary clarifier designed to treat 38,000 m3/d of sewage. The quantity of dry volatile solids removed by the plant is 0.15 kg dry solids/m3 sewage. The sludge contains 9..
a silty material is to be used to fill an earth damn. How much water must be added to bring the water content of each ton (2000 lb) of the material to 35% if the original watter content is 11.4%
Determine the elevation vs. surface area relationship for the vault and use this information to calculate and graph the elevation-storage relationship. Use the average end area method.
Select an ST shape to be used as a 20-ft long tension member to resist the following service loads: Dead load=38kips live load=115 kips and snow load= 75 kips. The connection is through the flange with 3/4inch diameter bolts in each line. Use A572 Gr..
Use slope deflection approach to find complete deflection solutions for a fixed fixed beam with concentrated force, F, distance a from left end and axial load P.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd