The station of a PI of a horizental curve is 60+20. The horizental curve has a degree of 4 and a length of 400ft. the othere given design perameters include. Superelevation runoff rate is 1/400. width of the pavement is is 15ft. normal crown slope is 2%. all maximum superelevation is 8%. find the following.

1. Station of PC and PT.

2. station where tangent runout starts

3. superelevation at station 58+00.

Reference no: EM13299377

Questions Cloud

Create an equivalent synthetic position using stocks : Given the prices below, is it more profitable to borrow money directly or to create an equivalent synthetic position using stocks and stock index futures? Use tables showing the payoffs to compare the two.
What is the expected annual divivdend growth rate : If the stock is selling for $50 today and the required return is 15, what is the expected annual divivdend growth rate after year two?
Which appears to be more attractive in terms of reacquiring : Compare the price in part A to the 8 percent call premium over par value. Which appears to be more attractive in terms of reacquiring the old bonds?
Evaluate the percent of each compound in the sample : 0.2356 g sample containing only NaCl and BaCl2 yielded 0.4637g of dried AgCl. Calculate the percent of each compound in the sample.
Determine the station where tangent runout starts : The station of a PI of a horizental curve is 60+20. The horizental curve has a degree of 4 and a length of 400ft. the othere given design perameters include. Superelevation runoff rate is 1/400. width of the pavement is is 15ft.
Compute the direction of the induced current in the loop : A square loop 15 cm on a side lies in the xy plane. Its resistance is .55 ohm. A magnetic field points in the +z direction, What is the direction of the induced current in the loop
What bolt sizes must be used for the allowable shear stress : A structural steel beam is attached to a column with bolts. The downward force on the connection is 150 kips. What bolt sizes must be used if the allowable shear stress is 25.0 ksi
What is carrying value of the bonds : Sielert Corporation borrowed $600,000 from National Bank on May 31, 2011. The three-year, 7% note required annual payments of $228,630 beginning May 31, 2012. Interest expense for the year ended December 31, 2011 was?
Determine the thickness of the guanine film : A screen is placed 1.0 meter away from the slits. Initially, you measure the interference pattern from the 2 slits on the screen. You then place the guanine film directly behind one of the slits, Determine the thickness of the guanine film

Reviews

Write a Review

Civil Engineering Questions & Answers

  What total allowable bod kg per day could be discharged

A 5000 m3/day wastewater treatment plant discharges to a river with a minimum drought flow of 140 m3/min (upstream of outfall) a)What total allowable BOD (kg/day) could be discharged by the plant if the BOD in the river after initial dilution must ..

  Largest principal stresses and maximum shear stress

The shaft diameter is 100 mm. Calculate the largest principal stresses and maximum shear stress that will occur in the shaft.

  Determine the operating speeds of the machine

Determine the operating speeds of the machine at which the machine's steady-state amplitude is less than 0.2 mm. Take keq = 3 EI/L3.

  Design condition inflow and pumping rates

Derive an equation that allows you to compute the diameter of the drain hole for a desired steady water height in the tank for the design condition inflow and pumping rates.

  Maximum rod diameter on lathe machine

If the tensil testing machine can apply no more than 925 lbs. of force to the specimen, calculate the maximum rod diameter that should be used. (precision 0.000)?

  What is the probability that a random sample

What is the probability that a random sample of 20 time intervals between eruptions has a mean longer than 95 minutes?

  Tackling the problem of making tunnel

You are a Project Manager on site where work for 3K.m. long Tunnel has been undertaken. The site is remote and takes about 2 days travel to nearest town. Supervisors, Technicians & Skilled Workers are engaged in dangerous / hazardous work.

  What is the distiniction b/n point and non point sources

what is the distiniction b/n point and non point sources of water pollution and thier varation with surface and ground water?

  Determine how high an elevated reservoir must be

Often times, this pressure comes from the fact that community's water supply is stored in an elevated reservoir. Determine how high an elevated reservoir must be so that the water supply has a pressure of 50 psi. Given: the unit weight of water is..

  Calculate the stoichiometric quantity of cl2 required

Aqueous sodium cyanide wastes at a metal processing industry are to be treated with chlorine and NaOH. Calculate the stoichiometric quantity of CL2 required daily to destroy the cyanide from 5 Kg of NaCN.

  Determine what will be the new height of fluid column

A u-tube manometer is used to measure the pressure of a vessel under vacuum. Assume the manometer is open to atmospheric pressure (101.325 kPa) and the density of the fluid in the manometer is 12.0 g/cm3.

  Determine the change in length of the steel bar

A steel bar of length 30 inches and circular cross section whose diameter varies linearly from 0.50 inches at one end to 0.75 inches at the other is subjected to an axial tensile force of 4.5 kip. Find the change in length of the bar.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd