Production Planning for Components Rummel Electronics produces two PC cards, a modem and a network adapter. Demand for these two products exceeds the amount that the firm can make, but there are no plans to increase production capacity in the short run. Instead, the firm plans to use subcontracting. The two main stages of production are fabrication and assembly, and either step can be subcontracted for either type of card. However, the company policy is not to subcontract both steps for either product. (That is, if modem cards are fabricated by a subcontractor, then they must be assembled in-house.) Components made by subcontractors must pass through the shipping and receiving departments, just like components made internally. At present, the firm has 5200 hours available in fabrication, 3600 in assembly and 3200 in shipping/inspection. The production requirements, in hours per unit, are given in the following table.
Product/mode
|
Fab.
|
Ass.
|
Ship.
|
Modem, made entirely in-house
|
0.35
|
0.16
|
0.08
|
Nctwork, made entirely in-house
|
0.47
|
0.15
|
0.12
|
Modem, fabricated by subcontractor
|
-
|
0.18
|
0.10
|
Network, fabricated by subcontractor
|
-
|
0.16
|
0.15
|
Modem. assembled by subcontractor
|
0.35
|
-
|
0.09
|
Network, assembled by subcontractor
|
0.47
|
-
|
0.14
|
The direct material costs for the modem cards are $3.25 for manufacturing and $0.50 for assembly; for network cards, the costs are $6.10 and $0.50. Subcontracting the manufacturing operation costs $5.35 for modem cards and $8.50 for network cards. Subcontracting the assembly operation costs $1.50 for either product. Modem cards sell for $20, and network cards sell for $28. The firm's policy, for each product, is that at most 40 percent of the units produced can have subcontracted fabrication, and at most 70 percent of the units can have subcontracted assembly.
(a) Determine the production and subcontracting schedule that will maximize profits, given that Rummel Electronics wishes its schedule to contain an integer number of units produced and subcontracted.
(b) Solve the problem without the integer restrictions. What is the solution? By how much (in percentage terms) do the restrictions alter the value of the optimal objective function?
Which statement regarding java files is false
: Need help with two questions on my final homework assignment. I think I know the answers but they are worth a lot of points so I want to be sure! 1. Which statement regarding Java files is false? a. Java imposes no structure on a file.
|
Did the fbi act under the color of any international laws
: Did the FBI act under the color of any international laws or compacts, or did they "go off the reservation?" Do the FBI's actions stand up to scrutiny under current US cyber laws? Have there been other, more recent examples of cases in which US la..
|
Integration of information from the participating databases
: Create an integration/metadata/ontology layer on top of these two inventory databases, local DB1 and local DB2
|
How a manufacturing company or a service company
: Develop three (3) examples that illustrate how a manufacturing company or a service company of your choice uses JIT, and then determine three to four (3-4) benefits of JIT for that particular organization. Discuss how the JIT concept differs betwe..
|
Determine the production and subcontracting schedule
: Determine the production and subcontracting schedule that will maximize profits, given that Rummel Electronics wishes its schedule to contain an integer number of units produced and subcontracted.
|
What systems does your organization utilize
: What systems does your organization utilize, either as a whole or per department? Is this solution effective? Why or why not? Is there a solution that would be more effective? If not, explain why.
|
Compute the tension in the supporting cable
: The water tank in Fig. P3.58 stands on a frictionless cart and feeds a jet of diameter 4 cm and velocity 8 m/s, which is deflected 60° by a vane. Compute the tension in the supporting cable.
|
Who are the relevant market and nonmarket stakeholders
: Who are the relevant market and nonmarket stakeholders in this situation? What possible solutions to this dispute do you think might emerge from dialogue between SunCal and its stakeholders
|
Easyphp and mysql setup
: Install EasyPHP and MySQL and take a screen shot that shows the MySQL prompt on your screen. (Note: You must include the screen shot which shows that MySQL is installed on your computer as part of your assignment. An installation guide to aid the ..
|