Determine the power rating of the heater in kw

Assignment Help Civil Engineering
Reference no: EM131030769

analyze the following question and answer it

A room is heated by a baseboard resistance heater. When the heat losses from the room on a winter day amount to 6500 kJ/h, the air temperature in the room remains constant even though the heater operates continuously. Determine the power rating of the heater, in kW.

2361_4d69dfd2-8a08-472f-a95f-c55528cf0f6e.png

Reference no: EM131030769

Questions Cloud

Determine the price of the io and po security : Determine the price of the IO and PO security, assuming that there is no prepayment. Further assume that the IO investors require a market rate of return of 4.5% and the PO investors require a market return of 6%.
Relatively inelastic demand curve : Characterize each of the following goods and services in terms of their price elasticity of demand. In so doing, indicate whether a steeply sloped (vertical) and relatively inelastic demand curve
Determine step that believe is the most important in process : Review the seven (7) steps required in the process of developing a strategic communication plan. Determine the step that you believe is the most important in the process. Include example(s) to support your response.
Develop a financial planning model : How much will your portfolio be worth in 10 years? In 20 years? When you stop working? The Human Resource department at EcoCarnifex Corporation was asked to develop a financial planning model that would help employees address these questions.
Determine the power rating of the heater in kw : When the heat losses from the room on a winter day amount to 6500 kJ/h, the air temperature in the room remains constant even though the heater operates continuously.
Cut taxes were opposed so strongly as treasury secretary : From Myth of the Robber Barons: Explain how Charles Schwab and Andrew Carnegie outperformed competitors and why these methods not successful at U.S. Steel and explain why Andrew Mellon’s attempts to cut taxes were opposed so strongly as U.S. Treasury..
Summarises current state and proposes sustainable strategies : Analyse the information presented and conceptualise the state of environmental planning in Australia. Apply innovative and entrepreneurial thinking and practice to corporate sustainability management in Australia and produce a report that summarise..
Does the current level of customer satisfaction : Write a data analysis report that provides the results to each of the fivehypothesis tests above and make overall recommendations to Computers R Us that management can use for future business decision-making.
Show the calculation of the gain : Equipment that cost $80,000 and has accumulated depreciation of $63,000 is exchanged for similar equipment with a fair value of $35,000 and $15,000 cash is received. The exchange lacked commercial substance. Directions: Respond to these questions ..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the magnitude of the average force acting

Determine the magnitude of the average force acting on a highway bumper when a 5000-lb car traveling at 60 mph crashes against it. The time interval during which the car is brought to rest is 0.3 s.

  Determine magnitude of acceleration at instant of car

A car travels along a horizontal circular curved road that has aradius of 600 m. If the speed is uniformly increased at a rate of 2000 km/ h2 , determine the magnitude of the acceleration at the instant the speed of the car is 60 km/h.

  Calculate equivalent pipe size and flow in the pipe

Water is transported from a reservoir at higher elevation to another reservoir through a series of three pipes. The first pipe of 400mm diameter is 500 m long, the second pipe 600 m long, size 300mm

  Determine the required dimensions of a hollow steel shaft

Determine the required dimensions. The inside diameter is to be two- thirds of the outside diameter. The allowable shearing stress is 70 MPa, and the angle of twist is not to exceed 4 degree in 3 m of the shaft.

  Sketch the processes on p-v coordinates and evaluate the

Carbon dioxide gas contained within a piston-cylinder assembly undergoes three processes in series. Sketch the processes on P-V coordinates and evaluate the work for each process in kJ.

  Determine the reactor basin volume of the influent bod5

The influent flow is 380 Lpcd and the influent BOD5 is 200 mg/L. Pertinent data are: Primary clarifier removes 33% of the influent BOD5, and the state regulatory agency allows a volumetric loading of 0.48 kg BOD5 /(m3.day). Determine the reactor b..

  Determine the required diameter of the shaft

The pulleys attached to the shaft are loaded as shown.  If the bearings at A and B exert only horizontal and vertical forces on the shaft, determine the required diameter of the shaft to the nearest 1/8 in. using the maximum-shear-stress theory of fa..

  Locate the well screen in the middle of aquifer formation

A well installed into a confined aquifer with a porosity of 0.3 and saturated thickness of 80 ft. The gravel pack requires a well screen slot width of 0.025 inches. The hydraulic conductivity of the aquifer is 60 ft/d.

  The lenght of measurement should be recordesd as how many

A tape that has an extra foot graduated to tenth outside  the zero mark was used to measure a distance less than a tape lenght. when the rear tapeman held the 52-ft graduation at his point, the head tapeman estamted the reading at  as his end of the ..

  Compute the flexural strerangth if the load is fracture

A three point bending test is performed on a glss specimen having a rectangular cross section of hight d =6 mm and width b = 12 mm the distance between support points is 45mm.

  Determine the weighted mean for the angles

Distance AB is observed repeatedly using the same equipment and procedures - Determine the weighted mean for the angles - What is the area of a rectangle field and its estimated error for the recorded values.

  What is the finished grade elevation on the curve at station

A sag vertical curve along an existing vertical alignment begins at station 23+45 and ends at station 30+25. The initial grade coming into the curve is -2% and the grade out is +5%. What is the finished grade elevation on the curve at station

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd