Determine the minimum necessary clearance height of overpass

Assignment Help Civil Engineering
Reference no: EM13309955

An overpass is being built over the PVI of an existing equal-tangent sag curve. The sag curve has a 70 mph design speed and G1 = -6% G2=+3%. Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI.

Reference no: EM13309955

Questions Cloud

What biodegradation reaction rate coefficient be achieved : Assuming the lagoons are well mixed and that there are no losses or gains of water in the lagoon other than the sewage input, what biodegradation reaction rate coefficient (in day^-1) must be achieved for a first order reaction that governs the de..
Identify recovery priorities for system resources : Identify recovery priorities for system resources. Based upon the results from the previous activities, system resources can more clearly be linked to critical business processes and functions. Priority levels can be established for sequencing rec..
Explain acetic acid and sodium acetate to raise the ph : How much 5.90 M NaOh must be added to 570.0 mL of a buffer that is 0.0210 M acetic acid and 0.0230 M sodium acetate to raise the pH to 5.75
Find mass of sand can be put on the raft : A wooden raft has a mass of 69 kg. When empty it floats in water (density 1000 kg/m3) with 25% of its volume submerged. What mass of sand can be put on the raft
Determine the minimum necessary clearance height of overpass : The sag curve has a 70 mph design speed and G1 = -6% G2=+3%. Determine the minimum necessary clearance height of the overpass and the resultant elevation of the bottom of the overpass over the PVI.
Explain organic chemistry when assigning priority to r : Organic Chemistry When assigning priority to R (clockwise) and S (counterclockwise) nomenclature of asymmetric carbon atoms, which has a greater priority CH3 or CH2CH3
Determine what is the periodic table form of the c-s-h gel : The C-S-H gel can come in a variety of chemical structure forms. If it has a cement notation form of C3 S2 H8, what is the periodic table form of this C-S-H gel. What would be the balanced equations for C3 S and C2 S when hydrated into this form
What is the angular acceleration of the tires : A ball rolls horizontally off a 45-m high cliff with vo=10 m/s. How far from the base of the cliff will it hit the ground, What is the angular acceleration of the tires
Explain naoh dissolves in enough water to make solution : A particular drain cleaner contains NaOH. What is the value of [OH-] in a solution produced when 50.0g of NaOH dissolves in enough water to make 250mL of solution

Reviews

Write a Review

Civil Engineering Questions & Answers

  Explain how to determine the final velocity of the crate

the 100 kg crate is originally at rest on the smooth horizontal surface. If a 200 newton force, acting at an angle of 45 degrees, is applied to the crate for 10 seconds. Determine the final velocity of the crate.

  Determine the location of the center of gravity of the cast

determine the location of the center of gravity of the cast aluminum block

  What is the maximum distance between the two particles

Before the second particle catches the first particle, what is the maximum distance between the two particles.

  What is the efficiency of the device

If a mechanical device requires 450J of work to do 310J of work in lifting what is the efficiency of the device?

  What is the predicted number of zebra mussels years from now

The zebra mussels have a net growth rate of 0.09 yr-1. At the current time there are 176 zebra mussels in the stream. What is the predicted number of zebra mussels 5, 10, and 20 years from now

  Calculate the distance d from the center of the earth

Calculate the distance d from the center of the earth at which the force on a particle from the moon is equal to 1.49 times the force on the particle from the earth. The particle is restricted to the line through the center of the earth and the mo..

  Sketch a streamline pathline and streakline

Sketch a streamline, pathline, and streakline, For a given flow the velocity from time t=0 to t=5s was u=2 m/s, v=0. Then from t=5s to t=10s the velocity was u=+3 m/s, v=-4 m/s. A dye streak was started at t=0

  Find what flow of water in gallons per second is required

The volume of water in a reservoir is often expressed using the unit of acre-foot. A volume of 1 acre-foot is the amount of water covering an area of 1 acre to a depth of 1 foot. Lake Mead is the largest man-made lake in the United States.

  Compare the reactor volume required for removal of substance

Complete mixed system that contains a single reactor against a system that contains three Complete Mixed reactors of equal volume in series. (total volume of three reactors should be equal to the single reactor)

  Well-known architect frank lloyd wright

Many years ago, well-known architect Frank Lloyd Wright designed a mile-high skyscraper, which has never been built.

  At what speed will a stationary observer on the earth

A jet aircraft is flying in a standard atmosphere at an altitude of 4,000 m at 900 km/hr. The frontal intake area of the jet engine is 0.80 m2. The engine exhaust area is 0.56 m2. The temperature of the exhaust gas is 120°C.

  What is break even point and when would be better to choose

A car dealership offers $2000 cash back; financing at 3.49% APR for 60 months or 0% APR for 60 months when you purchase a car. What is the break even point and when would it be better to choose one option over the other.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd