Determine the mass flow rate of the condensate water

Assignment Help Civil Engineering
Reference no: EM131033654

Two thousand cubic meters per hour of atmospheric air at 28°C with a dew point temperature of 25°C flows into an air conditioner that uses chilled water as the cooling fluid. The atmospheric air is to be cooled to 18°C. Sketch the system hardware and the psychrometric diagram for the process. Determine the mass flow rate of the condensate water, if any, leaving the air conditioner, in kg/h. If the cooling water has a 10°C temperature rise while flowing through the air conditioner, determine the volume flow rate of chilled water supplied to the air conditioner heat exchanger, in m3/min. The air conditioning process takes place at 100 kPa.

Reference no: EM131033654

Questions Cloud

What should microsoft do in the future : Read the short case, "Free-Product Competitors Challenge Microsoft," located on page 322 of the course textbook. Begin by assessing the free product competitors that are challenging Microsoft. They have not been aggressive in the free-product mar..
What are the benefits and the negatives of small teams : What are the benefits and the negatives of small teams? Could you confirm that most conflicts in organizations result from competition, differences in objectives, values, attitudes, and perceptions, as well as breakdowns in communications, individual..
How will it handle or make up for resulting staff shortage : The community surrounding Simonston Hospital has just experienced a debilitating ice storm, with loss of power expected for the next five to seven days. Employees at Simonston are showing up for work, but they are not alone: Some single parents have ..
Solve for the currents in each branch of the network : In problem 1 and 2, find a system of differential equations and initial conditions for the currents in the networks given by the schematic diagrams: the initial currents are all assumed to be zero. Solve for the currents in each branch of the netw..
Determine the mass flow rate of the condensate water : If the cooling water has a 10°C temperature rise while flowing through the air conditioner, determine the volume flow rate of chilled water supplied to the air conditioner heat exchanger, in m3/min. The air conditioning process takes place at 100 ..
Productivity and productivity growth : Productivity and Productivity Growth Wells Fargo Bank employs four loan officers, each working eight hours per day. Each officer processes an average of 4.0 loans per day. What was the labor productivity (in loans per labor hour) for the bank? What i..
Double-declining-balance depreciation for buildings : The following transactions and adjusting entries were completed by a paper-packaging company called Gravure Graphics International. The company uses straight-line depreciation for trucks and other vehicles, double-declining-balance depreciation fo..
Intend to manage the project as planned change : You’re an IKEA store manager, and corporate headquaters has instructed you to change the layout of your store. The change must be "dramatic", but the details are up to you. Wanting to make the most of the opportunity, you intend to manage the project..
Whether the given pseudo-code can always get correct answers : Give your modified merge join to give the correct answers for all cases with explanation in details.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the volumetric flow rate in each 15-cm duct

Air enters an electrical furnace at 20oC, 100 kPa, with a volumetric flow rate of 30 m3/min. The furnace delivers air at 40oC to a duct system with three branches consisting of two 15-cm-diameter ducts and a 30-cm-diameter duct.

  A linearly changing load

As shown below, a 20m long beam is fixed to a wall at point A, a linearly changing load from 10 kN/m (downward) at 10m to 0 kN/m at 20m, and a CW couple moment of 400kN·m located at 20m. Include all required FBD(s).

  How many trips would one rubber-tired herrywampus have

How many trips would one rubber-tired Herrywampus have to make to backfill a space with a geometrical volume of 5400 cubic yard. The maximum capacity of the machine is 30 cubic yard (heaped), or 40 tons.

  Determine the largest loadwhich can be applied

A block of 250mm length and 50x40mm cross section is tosupport a centric compressive load P. The material to be usedis a bronze for which E = 95GPa. knowing that the normal stress must notexceed 80 MPa and that the decrease in length of the block sho..

  Determine saturated unit weight and effective unit weight

The wet mass of a sample of saturated soil is 520 grams. The dry mass, after oven-drying, is 400 grams. Determine the a) water content b)void ration c)saturated unit weight, and d)effective unit weight

  Compute and plot the water surface profile upstream of lake

A rectangular channel leading from an upstream lake has a bottom width of 20 ft, bottom slope of 0.0002, a Manning roughness factor of 0.016, a discharge of 403 cfs, and normal depth of 6.24 ft.

  Determine the scs time of concentration of a 400-ft

The channel has side slopes of 4H:1V and a longitudinal slope of 0.5%. Assume a depth of flow of 6-inches. The parking lot slopes at 1% toward the channel from both sides, and the 2-year, 24-hour rainfall is 2in.

  Determine the inlet volumetric flow rate for the ammonia

The magitude of the power input to the compressor is 7,5kW and there is heat tranfser from the compressor to the surroundings at a rate of 0.15kW. Kinetic and potential energy are negligible.

  Find the safety index in both flexure and shear

Find the global safety factor in both flexure and shear and find the safety index in both flexure and shear

  Determine the rate of superelevation on the c

A curved section of a two-lane highway measured in the field was found to be 22 feet wide and have an elevation difference of 1.37 feet between the outside and inside edges of the pavement

  Determine the maximum tensile and compression stresses in

A 6ft wide, 10ft high vertical rectangular gate has its top edge 6ft below the water level. it is hinged along its lower edge. what force, acting on the top edge, is necessary to hold the gate shut?

  Determine which method of extraction should be used

Ocean water contains 0.9 ounce of gold per ton. Method A costs $220 per ton of water processed and will recover 85% of the metal. Method B costs $160 per ton of water processed and will recover e of the metal.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd