Problem and Report -

A skeleton power system is shown in Figure 1.  The equipment specification for the system to be designed are provided in Appendix C. The performance criteria and methods to meet the criteria are provided in Appendix A. Using a power flow program, manual calculations and knowledge learned in class, the power system was designed to meet the criteria while minimizing the cost of equipment and dispatching generation in the most economical manner.

The report is broken into the following sections:

Section 1: Component Models and Parameter Evaluation.

Section 2: Preliminary Base Case and its Deficiencies

Section 3: Series and Shunt Compensation Calculations for the 345 kV line.

Section 4: Justification for Any Added Lines

Section 5: Equipment Schedules and Flow Diagrams.

The sequence of activities used to complete this system design and prepare the final report are given in Appendix B.

Appendix B - Sequence of Steps Used for Completing System Design

1- Make calculations for the system model using 100 MVA base and kV bases of 22 kV, 230 kV and 345 kV.

2- Prepare impedance diagram

3- Prepare data for computer program input

4- Make computer data file

5- Run preliminary base case.  (Heavily loaded system.)  Hint: You will need to add fictitious generators at buses to get the power flow to solve.)

6- Determine series capacitor requirements for the 345 kV lines assuming you'll need to ship all 600 MW from generators 1 and 2 over one line (one line out) under heavily loaded case.

7- Determine fixed shunt reactor requirements under lightly loaded case to compensate for the Ferranti Effect on the 345 kV lines

8- Determine the need for additional lines or equipment

9- Determine the generator voltage schedules, transformer tap schedules and switched shunt reactor and capacitor requirements for voltage control for base case.  (See definition of the base case: heavily loaded etc.)

10- Determine the generator voltage schedules, transformer tap schedules and switched shunt reactor and capacitor requirements for voltage control for lightly loaded case.

11- Fill in the schedule templates for the heavily loaded case with one line out of service and the lightly loaded case.

Attachment:- Assignment File.rar

Reference no: EM131426669

Questions Cloud

Write a summary discussing the cognitive processes associate : Write a summary discussing the cognitive processes associated with language and their functions.Write in a clear, concise, and organized manner; demonstrate ethical scholarship in the accurate representation and attribution of sources.
Draw and label the graphs of the pdf : 1. Draw and label the graphs of the pdf (together, on one set of axes) of N(0,1) and N(-1, 2). Your graphs should display how the different parameters of the two distributions affect the pdfs.
What is the mean time until the document begins to print : What is the mean time until the document begins to print?- What is the probability that the document will begin to print within 30 seconds?
Find info about iceland imports : Identify the top 5 countries that both countries receive their imports. Identify the top 2-3 product groups imported by each country. List the product code and abbreviated title.
Determine the generator voltage schedules : The sequence of activities used to complete this system design and prepare the final report are given in Appendix B. Appendix B - Sequence of Steps Used for Completing System Design. Determine the generator voltage schedules, transformer tap schedule..
Discuss overcoming chemical and behavioral addictions : According to Grant, Potenza, Weinstein, and Gorelick, "behavioral addictions are often preceded by feelings of "tension or arousal before committing the act" and "pleasure, gratification, or relief at the time of committing the act" (Grant, Potenz..
Members of the project team and key stakeholders : Who should be included as members of the project team, key stakeholders, and project sponsors in a clinical project in a physicians office? In a hospital? Support your choices.
About their product before they put out on the market : What are questions a company should ask about their product before they put out on the market? What are the steps a buyer thinks about before they purchase a product? What might influence their decision, such as brand types or prices? As you get olde..
Venture capital for software development : Hart Venture Capital (HVC) specializes in providing venture capital for software development and Internet applications. Currently HVC has two investment opportunities:

Reviews

len1426669

3/14/2017 4:41:58 AM

Please follow the template for step by step instructions. Remember: You are writing a report to be read by a colleague. You should be deleting anything I have here that is a hint/direction for you. You will lose points if leave irrelevant text in the report.

Write a Review

Other Engineering Questions & Answers

  How many pounds of effort would be needed to lif

A fixed pulley system has 4 strands with only 3 supporting. How many pounds of effort would be needed to lift a 600 lb weight?

  Basic knowledge of optical communication systems

To assess the technical and presentation skills by exploring the technical knowledge gained in optical commination systems -

  Compute even parity for the given

ECE 204- Compute even parity for the following: (7BD3 8465)16, (D68A A7B4)16 and (0587 FF39)16. Complete the table below with the appropriate portion of a 5-bit Gray code and give the equivalent hexadecimal value.

  Determine the hourly volume for these conditions

The highway is on rolling terrain with 10% large trucks and buses (no recreational vehicles), and the peak-hour factor is 0.90. Determine the hourly volume for these conditions.

  Design a real time flood monitoring system

Design a Real Time Flood Monitoring System based on Arduino Microcontroller.The system should monitor flood related information like Water level and Precipitation.The data collected from the sensors should be transferred to a client application via i..

  Describe in detail the water treatment plant

Describe in detail the water treatment plant - The polyelectrolyte dosing process and the sludge blanket conditioning (TFG) and control within the upward flow clarifier

  In a program for the core two microprocessor operating

29) Suppose that DS = 1000H, SS = 2000H, BP = 1000H, and D1 = 0100H. Determine the  Memory address accessed by each of the following instructions, assuming real mode Operation:

  Design a circuit and arduino program that accomplishes

Design a circuit and Arduino program that accomplishes the following. Reads a press of a pushbutton once, and it cycles through all possible brightness values.

  Moisture content of bentonite

Analyze a drier that reduces the moisture content of bentonite from 11% (bone dry basis) to 4% bdb. Assume the plant processes 100 tons/day is a gas fired rotary kiln (8 ft ID x 120 ft long).

  System showing pertinent signals and subsystem

Draw a functional block diagram of the system showing pertinent signals and subsystems (Meier, 1992).

  Develop a bill of material and order parts

Describe the product in you are planning to design using a brief report and discuss the safety features you would incorporate in to the design for the safety of users and to comply with industry requirements in Australia.

  Discuss the legitimacy of modeling approach

Discuss the legitimacy of modeling approach - Suppose that a simulation model is built for a manufacturing system consisting of a large number of machines in series separated by buffers.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd