A drinking water treatment plant will be designed to process a flow of 15,000 m3/d. The sedimentation tank will have a residence (detention) time of 4 hours and the overflow rate (Q/A) of 16 m3/m2-day. Estimate the required surface area (A), and the diameter and the depth of the tank.
A rigid tank contains 1 kg of H20 at 100 kPa, x=0.1. Given that the tank can withstand a maximum internal pressure of 2 MPa, determine (a)the maximum temperature to which the steam in the tank can be heated,
What is the concentration of NH3 (in mg/L) of household ammonia that contains 3.00 percent by wieght of NH3. Assume the density of water = 1000kg/m^3
if the sludge concentration in the return sludge line from the secondary clarifier were the same as the MLVSS concentration.WOULD recycle of return sludge increase the sludge age why
The water line to a house is usually 3'4" copper tube. Find the flow rate that can be delivered and still maintain laminar flow in the tube
The cable from point A to point B exerts a 900 N force on the top of the television transmission tower that is represented by the vector F. Express F in Cartesian vector form using the coordinate system.
Compute the maximum acceptable tensile service load T that may act on a single angle L6x4x3/4 that is welded along only one leg to a gusset plate; thus, there are no holes. The service load is three times the dead load. Solve for a0 A36 steel.
A flowrate of 3.5 ft^3/s is to be maintained in a horizontal aluminum pipe ( E = 5 * 10 ^-6 ft). The inlet and outlet pressures are 65 psi and 30 psi, respectively, and the pipe length is 500ft. Determine the diameter of the pipe.
The cylinder B is released from rest. Determine the speed of both masses (vA and vB) after B moves by h m. Also calculate the angular displacement for the pulley D. The diameter of the pulley D is 0.2 m. Neglect all friction.
The dye appears 14 days later in an observation well 75 ft away from the injection point. Compute the seepage velocity and estimate the hydraulic gradient in the aquifer if the porosity of the soil is 42%.
Assess the adequacy of this existing curve in light of the reconstruction design speed of 60 mi/h and, if the existing curve is inadequate, compute a satisfactory curve length.
Two remediation options are being considered for a contaminated land area formerly used for industrial operations. Option 1 involves removing all of the contaminated soil over a two-year period at a cost of $2.2 million per year
if a person and a wheelchair weigh 185 lbs how much effort force is required to travel up a ramp whose slope of 24.08 ft.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd