an equal-tangent sag vertical curve is designed with the PVC AT STation 109 + 00 and elevation 950 ft, the PVI at station 110 + 77 and elevation 947.34ft,and the low point at station 110 + 50 . Determine the design speed of the curve.
How to draw bending moment diagram for this shape and the value of the moment in critical sections assume that the distributed load (w) KN/M and the concentrated load
Determine the COD, carbonaceous BOD, and nitrogenous oxygen demand of a 100 mg/L solution of urea (N2H4CO)
Assuming uniformly decelerated motion, determine the velocity and acceleration of point C of the belt, (a) immediately before the power is turned off. (b) 9 s later.
What are minerals? Sketch different types of mineral crystal forms and list different types of rock forming minerals. Describe with examples the importance of mineral identification in engineering applications.
A simple curve has a central angle of 42 degreess. A point Y is located 24m from the vertex and has a perpendicular distance of 3.00m from the back tangent.
The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.
Carbon disulfide (CS2) reacts with excess chlorine (Cl2) to produce carbon tetrachloride (CCl4) and disulfur dichloride (S2Cl2). If 69.7 g of CS2 yields 62.6 g of CCl4, what is the percent yield? (Hint, you must first write the balanced equation.)
Compute the maximum acceptable service load on an A36 steel plate tension member 1/4in.x12in. having a single line of holes parallel to the direction of loading. The load is 25% dead load and 75% live load, and 7/8in. diameter bolts are used.
A college student borrows $1500 during his senior year. The loan is to be repaid in 20 equal quarterly installments. The interest rate is 5% per year with the first payment to be made 3 years after the date of the loan. What will be the approximat..
A 45 kg machine is placed at the end of a 1.6 m long cantilever beam of elastic modulus 200 x 109 N/m and cross-sectional moment of inertia 1.6 x 10-5 m4.
Briefly describe the measures that should be considered for the control of corrosion of embedded steel in concrete.
A four-lane freeway is on a mountainous terrain with 11-ft lanes, a 5-ft right-side shoulder, and a 3-ft left side shoulder. During the peak hour there are 12% trucks and buses and 6% recreational vehicles.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd