Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Determine the axle loads (normal forces at A, B, and C) for the ore hauler when it is parked on a horizontal roadway with its brakes off. The masses of the cab and the trailer are 4000 kg and 6000 kg, respectively, with centers of gravity at D and E. Assume that the connection at F is equivalent to a smooth pin.
Project: Construction of Carbon Revolution Building. You are members of the Capital Projects Team of Facility Services Department at Deakin University who are assigned to undertake work encompassing a high level estimate of building cost of the Str..
The point of intersection of the centerline of Elm Road with the centerline of first Street was originally recorded (using a 30-m steel tape) as being at 6 + 71.225. How far from existing sation mark 5 + 00 on first street would a surveyor have to
In an unconfined aquifer having K = 30/m/day, two observation wells, 3km apart, have water levels of 50 and 40 m, respectively, above the base of the aquifer. Determine the rate of flow.
A cutting 9 m deep is to be excavated in saturated clay of unit weight 19 kN/m3. The design shear strength parameters are cu = 30 kN/ m2 and u = 0. A hard stratum underlies the clay at a depth of 11 m below ground level.
Vehicles arrive at a toll bridge at a rate of 430 veh/hr (the time between arrivals is exponentially distributed) Two toll booths are open and each can process arrivals (collect tolls) at a mean rate of 10 seconds per vehicle
Martin pays rent of $500 per month for the 9-month acedemic year, he is going to travel the world this summer and won't be working. how much must he set aside in his savings account for the 3-month summer to cover his rent for the next year
A sample of natural glacial till was taken from below the groundwater table. The water content was found to be 52%. Estimate the wet density, dry density, buoyant density, porosity and void ratio. Clearly state any necessary assumptions.
A student bought a $75 used guitar and agreed to pay for with a single $85 payment at the end of the 6 months. assuming semiannual (every 6 months) compounding, what is the normal annual interest rate? what is the effective interest rate?
a 5 inch inside diameter well is to be placed to a total depth of 60 m in an unconfined sand aquifer. the saturated
Natural gas (methane) is burned with stoichiometric air with reactants supplied at the reference conditions P0, T0 in a steady-flow burner. The products come out at 1400 R. If the burner should deliver 10 Btu/s, what is the needed flow rate of natur..
what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?
Water is flowing in a 6-cm diameter pipe at 20 m/s at 10?C. If the pipe enlarges to a diameter of 12-cm, calculate the reduced velocity. Also, calculate the mass flux rate and the flow rate.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd