Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A level section of highway is to be connected to a section of highway with a -5.0 grade. The level highway section ends at station 108+40 (elevation 865 ft)and is to connect with the -5.0 section of highway at station 139+20 (elevation 758 ft) Using design speed of 50 mph determine the stations and elevations of the PVCs, PVIs and PVTs of the two vertical curves required to connect the highway segments, as well as the length of the constant grade section (connecting grade is to be small as possible).
Using a design speed of 50 mi/h, determine the stations and elevations of PVCs, PVIs, and PVTs of the two vertical curves required to connect the highway segments, as well as the length of the constant grade section (connecting grade is to be as s..
the 3.5mg engine is suspended from a 500 kg spreader beam and hoisted by a crane which gives it an acceleration of 4m/s^2 when it has a velocity of 2m/s. determine the force in chains AC and AD during the lift.
Use modern software tools to analyze a structural system of a building.
A consolidated-drained triaxial shear test on a normally consolidated clay yielded a drained friction angle of 28 degrees. If the confining pressure during the test was 15 psi, what was the major principal stress at failure.
The base engine develops 200 ft-lb of torque, and a modified version of the engine develops 240 ft-lb of torque. If the overall gear reduction ratio is 8 to 1, what is the maximum acceleration from rest (in ft/sec^2) for:
Given that uniform flow is subcrital and there is a weir in a rectangular channel, how do you determine what the weir height should be to force the flow to be critical. Draw this transition on a specific energy curve.
Conduct either a qualitative or quantitative risk assessment on this project. Identify the risk factors that you consider most important for the suspension bridge construction. How would you assess the riskiness of the project? Why?
Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.
Assuming constant acceleration, determine how long the train blocked the crossing. Dis- regard the width of the crossing.
The steam flow rate entering the pipe is 2500kg/hr. Due to heat loss from the pipe to the surrounding air (at 25 C) 20 kg/hr of condensate is formed in the pipe and removed at the end of the pipe.
The traffic stream consists of cars, buses, and large trucks (no recreational vechicles). A weekday directional peak-hour volume of 1800 vehicles (familar users) is observed, with 700 arriving in the most congested 15 min period.
suppose helen deposits $4000 today and one year from today she deposits $1000. Each year she increases her deposit by $500 until she makes her last deposits on roberta's 18 birthday. how much is on deposit after the 18th birhday
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd