Determine station of pvc and pvt and design speed of curve

Assignment Help Civil Engineering
Reference no: EM13302720

An equal-tangent crest vertical curve connects a +3.2% and -1.1% grade. The PVI is at station 98+20. Due to drainage considerations, the highest point of the curve is at station 100+79.35. Determine the station of the PVC and PVT, and the design speed of the curve.

Reference no: EM13302720

Questions Cloud

How much is collected from accounts receivable in november : Wiggles Right forecasted sales of $5,000 in October, $4,000 in November and $4,000 in December. All sales are on credit. 40% is collected the month of sale and the remainder the following month. How much is collected from accounts receivable in No..
Calculate its increase in volume : The active element of a certain laser is an ordinary glass rod 19.5 cm long and 1.37 cm in diameter. Calculate its increase in volume
Mini case: cisco systems : Mini Case: Cisco Systems
Find size impulse is exerted on the bungee jumper : A bungee jumper (m = 66.00 kg) tied to a 48.00 m cord, leaps off a 78.00 m tall bridge. What size impulse is exerted on the bungee jumper while the cord stretches
Determine station of pvc and pvt and design speed of curve : An equal-tangent crest vertical curve connects a +3.2% and -1.1% grade. The PVI is at station 98+20. Due to drainage considerations, the highest point of the curve is at station 100+79.35.
What is the implied one-year rate two years from now : Two-year 10% coupon $1,000 par bond selling for $1,000 Assume that the expected theory for the term structure of interest rates holds, no liquidity premium exists, and the bonds are equally risky. What is the implied one-year rate two years from n..
Calculate the density and specific weight of carbon dioxide : calculate the density and specific weight of carbon dioxide at a pressure of 300 kN/m^2 absolute and 60º C
Find the factor by which kinetic energy of ball increases : A ball and bat, approaching one another each with the same speed of 1.1 m/s collide. Find the speed of the ball after the collision. find the factor by which the kinetic energy of the ball increases
How would each of these plans affect earnings per share : How would each of these plans affect earnings per share? (Round your answers to 2 decimal places. Omit the "tiny_mce_markerquot; sign in your response.)

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Using present worth analysis which process should b selected

The operating cost will be $10,000 per quarter with a salvage value of $25,000 after its 2-year life. Process B will have a first cost of $250,000, an operating cost of $15,000 per quarter and a $40,000 salvage value after its 4-year life.

  Determining specific gravity

The cross sectional dimensions of a 4-ft-long wood member at 30% moisture content is 1.5 in. x 7.5 in., and its weight is 11 lb. At oven-dry condition, its dimensions and weight are 1.35 in x 6.8 in., and 10.2, respectively. What is its specific g..

  Design condition inflow and pumping rates

Derive an equation that allows you to compute the diameter of the drain hole for a desired steady water height in the tank for the design condition inflow and pumping rates.

  What is the dry unit weight of this material

A soil borrow material in its natural state in the ground has a unit weight of 118pcf. Its natural water content is 7%. What is the dry unit weight of this material?

  Compute the ratio of the nominal flexural strength

Compute the ratio of the nominal flexural strength of the beam to the maximum service load moment, and compare your findings to the ACI load factors and strength reduction factor.

  Determine mans velocity and acceleration at the instant

While the swing bridge is closing with a constant rotation of 0.5 rad/s, a man runs along the roadway such that when d = 10 ft he is running outward from the center at 5ft/s with an acceleration of 2 ft/s^2, both measured relative to the roadway.

  What is the change in it internal energy

A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?

  Find the work done in pumping the water

a horizontal cylindrical tank 4 ft in diameter and 10 ft long is full of water. find the work done in pumping the water to a point 4 above the top of the tank.

  Who has been offered a 5-year contract at a remote location

Suzanne is a recent chemical engineering graduate who has been offered a 5-year contract at a remote location. She has been offered two choices. The first is a fixed salary of $75,000 per year.

  Design lined trapezoidal channel to carry on longitudinal

Design a lined trapezoidal channel to carry 20 m^3/sec on a longitudinal sloe of 0.0015. The lining of the channel is to be float-finished concrete (n=0.015). Consider (a) the best hydraulic section and (b) the section with side slopes 1.5:1 (H:V)

  How much was invested in each account

Suppose a person invests a total of $10,000 in two accounts. One account earns 8% annually, and the other earns 9% annually. If the total interests earned from both accounts in a year is $860, how much was invested in each account?

  Write mass balance equation for an ideal 1d plug-flow stream

Assume the rate constant for BOD decay is 0.2 d^-1, the mean velocity of the stream is 0.5 m s^-1, and the initial concentration is 100 mg L^-1 at x=0. Plot the resulting concentration with downstream distance x in km.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd