An equal-tangent crest vertical curve connects a +3.2% and -1.1% grade. The PVI is at station 98+20. Due to drainage considerations, the highest point of the curve is at station 100+79.35. Determine the station of the PVC and PVT, and the design speed of the curve.
The operating cost will be $10,000 per quarter with a salvage value of $25,000 after its 2-year life. Process B will have a first cost of $250,000, an operating cost of $15,000 per quarter and a $40,000 salvage value after its 4-year life.
The cross sectional dimensions of a 4-ft-long wood member at 30% moisture content is 1.5 in. x 7.5 in., and its weight is 11 lb. At oven-dry condition, its dimensions and weight are 1.35 in x 6.8 in., and 10.2, respectively. What is its specific g..
Derive an equation that allows you to compute the diameter of the drain hole for a desired steady water height in the tank for the design condition inflow and pumping rates.
A soil borrow material in its natural state in the ground has a unit weight of 118pcf. Its natural water content is 7%. What is the dry unit weight of this material?
Compute the ratio of the nominal flexural strength of the beam to the maximum service load moment, and compare your findings to the ACI load factors and strength reduction factor.
While the swing bridge is closing with a constant rotation of 0.5 rad/s, a man runs along the roadway such that when d = 10 ft he is running outward from the center at 5ft/s with an acceleration of 2 ft/s^2, both measured relative to the roadway.
A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?
a horizontal cylindrical tank 4 ft in diameter and 10 ft long is full of water. find the work done in pumping the water to a point 4 above the top of the tank.
Suzanne is a recent chemical engineering graduate who has been offered a 5-year contract at a remote location. She has been offered two choices. The first is a fixed salary of $75,000 per year.
Design a lined trapezoidal channel to carry 20 m^3/sec on a longitudinal sloe of 0.0015. The lining of the channel is to be float-finished concrete (n=0.015). Consider (a) the best hydraulic section and (b) the section with side slopes 1.5:1 (H:V)
Suppose a person invests a total of $10,000 in two accounts. One account earns 8% annually, and the other earns 9% annually. If the total interests earned from both accounts in a year is $860, how much was invested in each account?
Assume the rate constant for BOD decay is 0.2 d^-1, the mean velocity of the stream is 0.5 m s^-1, and the initial concentration is 100 mg L^-1 at x=0. Plot the resulting concentration with downstream distance x in km.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd