Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A 450 piece/hr 10 hr B 500 piece/hr 8 hr A set of unsharpen ed tools costs $1,500 and can be ground 15 times. The cost of each grinding is $20. The time required to change and reset the tools is 2 hours, and such changes are made by a tool-setter who is paid $16/hour. The production machine operator is paid $15/hour, including the time that the machine is down for tool sharpening. Variable overhead on the machine is charged at the rate of $30/hour, including tool-changing time. At what speed should the machine be operated to minimize the total cost per piece?
When the two windings are connected to a a.c supply of 50hz, the field current is 0.1A, the armature current is 100A and the phase difference between them is 60 degree. calculate the average torque and maximum torque.
Machine A was purchased three years ago for $10,000 and had an estimated market value of $1,700 at the end of its 10-year life. Annual operating costs are $1,350. The machine will perform satisfactorily for the next seven years.
what would be the advantage, if any, of using a general equilibrium analysis to answer this question? Illustrate diagrammatically.
What is the memory layout of the 16-bit value, 0x7654 in a big-endian 16-bit machine.
Voltage in complex forms, An engine consumes 10kw of power and 4kvar reactive power at a current of (6+j4)Amps
For the given circuit, determine the function of it I.e. is it OR gate? Or AND gate,.. Show all your answer, also draw the symbol and truth table of it.
Hard to find all the information, Just want to ask for people who can give some good webside which can provide all the informationat at lease price,maximum output power, voltage, and current per module; short circuit current; dimension; weight; ma..
What are the drawbacks to developing resources offshore?
A hydroelectric dam has a penstock that discharges 10^5 kg/s of water. The head of the dam is 80m. a. compute the volume of the discharged water per second (flow rate). b. compute the power of the water entering the turbine
A 100 W bulb takes 0.833A and a 200 W bulb takes 1.67 A from a 120V source. If the two bulb were connected across a 240 V source, what current in amperes will flow through the bulbs?
Power factor improvement, An industrial user has a number of machine tools which are driven by three phase induction motors. during a particular shift, the power factor of the combined load can vary between 0.65(100 KVA load) and 0.81 (20 KVA) loa..
Three two-input "AND" gates have their outputs connected to an "OR" gate. The first "AND" gate has each of its inputs at logic HIGH level. The second "AND" gate has each of it's inputs at logic LOW level.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd