Describe the problem of lack of coordination between design and construction in a traditional contract.In agency CM,what expertise does the CM provide during the pre-design and design phase?In agency CM,what expertise does the CM provide during the construction phase?Describe what the CM does in CMAR.Explain why having a single party to contact is an important aspect of design-build.List three potential benefits of using the design-build approach.List four things that should be included in the general information section of an RFP?Discuss the disadvantages of using the best value procurement.Discuss the formation of teams and consortiums.Explain why the need for good scheduling and planning of construction projects becomes more acute as construction projects become more complex.Describe the CPM backward pass.Describe at least four basic features of CPM software.Describe the CPM and project cost control.Describe the budgeted cost of work performed(BCWP).Discuss how complexity influences the cost of a construction project.

Reference no: EM13563816

Questions Cloud

What is the average velocity of the body for the time : What is the average velocity of the body for the time interval, t = 0 and the time that it crosses the X-axis?
Determine the difference between the pressure is acting : Shaquille O Neal, who is listed as 7`1" tall is out of the NBA Playoffs and so has time to visit is pool. If he stands vertically in the water, completely submerged, determine the difference between the pressure is acting at his head and at his toes,..
Determine the height of the building in feet : The basic barometer can be used to measure the height of abuilding. If the barometric readings at the top and at the bottomof a building are 28.7 and 29.7 in Hg, respectively, determine the height of the building in feet. Assume an average density of..
Determine the cost of capital for the company : A new space age development corporation in wichita kansas has borrowed a sum of $4M from a friendly bank at an interest rate of 9%. the company has also borrowed another $1M from other sources at an interest rate of 8%
Describe the problem of lack of coordination between design : Describe the problem of lack of coordination between design and construction in a traditional contract.In agency CM,what expertise does the CM provide during the pre-design and design phase?
Determine if the process is possible from the second law : Steam at 800kpa and 300 degree celsius exists in the large supply line. when the valve opened from the large supply the steam enters into an empty, evacuated tank with a volume of 0.3m cube
What is the offset at the midpoint on the curve : A vertical curve with grade1= 3.6% meets the exit grade of -4.7% at PVI located at station 26.50. A vertical curve of 700 feet is propsed to provide the transition between the two grades
Calculate the loss of pressure which will occur in the pipe : An 180 m long 100 mm diameter compressed air pipeline is to be run from a stationary compressor to an air-track drill which requires a flow of 780 l/sec. The pipeline contains 2 large radius bends (R=2d) ,and 4 half closed gate valves.
Determine the deflection angle to the last full station : Air enters adiobatic compressor at 100kpa, 20 degrees celcius at rate of 0.1 kg/s and exits at 200 degrees celcious. compressor efficiency is 70%. Determine the exit pressure and power required.

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Calculate what is the flow rate of water over a length

The pressure drop in a 10 cm galvanized iron horizontal pipe (ks=.15mm) carrying water over a length of 50 m is 30 kPa. What is the flow rate

  Determine the slope angle at which failure would occur

A cutting 9 m deep is to be excavated in saturated clay of unit weight 19 kN/m3. The design shear strength parameters are cu = 30 kN/ m2 and ?u = 0. A hard stratum underlies the clay at a depth of 11 m below ground level.

  Determine the force in each member

The truss shown consists of 9 members and is supported by a ball and socket at A, two short links at B, and one short link at G. Check that this truss is a simple truss, that it is completely constrained

  Determine the normal capacity of the highway

Determine the normal capacity of the highway, the capacity of the highway upstream of the work zone, and the capacity within or in the vicinity of the work zone.

  Determine what is the air void content of core 2 of mixture

An asphalt mixture is placed and compacted. Two tests are taken from the compacted mixture and checked for density. Core 1 had a density of 2403 kg/m3 and an air void content of 6.5%. Core 2 had a density of 2419 kg/m3.

  What is the specific discharge in the rectangular channel

A large concrete channel holds a hydraulic jump in which the subcritical depth of flow is 2.5 m. If 40 percent of the specific energy in the flow is lost through the hydraulic jump, what is the specific discharge in this rectangular channel

  Determine the distance d to the point where skier lands

(a) Determine the distance d to the point where he lands. (b)What are the magnitudes of his components of velocity parallel and perpendicular to the 45 degree surface just before he lands

  Explain the observed behaviour of the polyethylene sheet

Sandwhich structures are obviously very efficient in bending applications. Would they be equally efficient in tensile or compressive loading? Explain your answer in terms of area available for carrying tensile-compressive loads.

  What will the ammonia concentration be 10 miles downstream

The concentration of ammonia is 6 mg/L at one point in the river. If the first - order decay coefficient for the conversion of ammonia to nitrate is 0.05 day-1, what will the ammonia concentration be 10 miles downstream.

  What reduction below atmospheric pressure must be achieved

water at 150 degrees in a beaker is placed in an airtight chamber. Air is gradually pumped out of the container. What reduction below atmospheric pressure of 14.7 psi must be achieved before water boils

  How many kilograms each of pearlite and the proeutectoid

If we have 2.5 kg of austenite containing 0.65 wt% C, and it is cooled to below 727?C (a) What is the proeutectoid phase? (b) How many kilograms each of total ferrite and cementite form?

  What are the adjusted elevations for benchmarks b c and d

Differential leveling between benchmarks A,B,C,D, and A gives elevation differences(m) of -15.632, 32.458, 38.214, and -55.025, and distances(km) of 4,6,5, and 3 respectively.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd