Define cost assigned to the units in the ending work

Assignment Help Cost Accounting
Reference no: EM13505729

In the month of September, a department had 500 units in the beginning work in process inventory that were 60% complete. These units had $30,000 of materials costs and $22,500 of conversion costs. Materials are added at the beginning of the process and conversion costs are added uniformly throughout the process. During September, 10,000 units were completed and transferred to the finished goods inventory and there were 2,000 units that were 25% complete in the ending work in process inventory on September 30. During September, manufacturing costs charged to the department were: Materials $690,000; Conversion costs $765,000.

The cost assigned to the units in the ending work in process inventory on September 30 was.

 

Reference no: EM13505729

Questions Cloud

Explain sodium thiosulfate solution : How do you determine the concentration of thiosulfate ions in 0.25M sodium thiosulfate solution
Should norman accept or reject the special order : Should Norman accept or reject the special order to pour 40 slabs for $2,250 each? Support your answer with appropriate computations.
Define the solubility products for the compound : From the solubility data given, calculate the solubility products for the following compound Ag3PO4, 6.7 x 10^-3 g/L
How much work is done by the truck in pulling the blimp : A small blimp is used for advertising purposes at a football game. It has a mass of 86.6 kg and is attached by a towrope to a truck on the ground. how much work is done by the truck in pulling the blimpb
Define cost assigned to the units in the ending work : In the month of September, a department had 500 units in the beginning work in process inventory that were 60% complete. These units had $30,000 of materials costs and $22,500 of conversion costs.
What is the speed with which the sled moves across the snow : A horse draws a sled horizontally on snow at constant speed. The horse can produce a power of 1.095 hp. What is the speed with which the sled moves across the snow
Find out the molar solubility in solution : The solubility product of PbBr2 is 8.9x10^-6. Determine the molar solubility in 0.20M Pb(NO3)2 solution
What is the total work done by this force : A constant force, F = (4.63, ?3.79, 1.96) N,acts on an object of mass 18.9 kg, What is the total work done by this force
Identify performance gaps between the bookstore results : Identify performance gaps between the Bookstore results and the AUCC averages and consider possible corrective actions and what objectives and related performance measures might she consider? Provide specific answers.

Reviews

Write a Review

Cost Accounting Questions & Answers

  Topper sports inc produces high quality sports equipment

topper sports inc. produces high quality sports equipment. the companys racket division manufactures three tennis

  Compute the number of units in the ending inventory

Prepare an income statement for the year ended December 31, 20X6, by using direct costing -Compute the number of units in the ending inventory.

  Determined overhead rate for the year

actual manufacturing overhead was $181,500. The pre - determined overhead rate for the year must have been

  Evaluate what is allie''s basis in the land

Allie took the land subject to the $100,000 liability and Evaluate what is Allie's basis in the land?

  Adjusting enteries,bank reconlilation

The offer price is for all Adjusting Enteries,Bank reconlilation and financial statement for this assignment..... Plus all extra info last trail balance error cheque account balance was $93410 and Account Recievable $65206.

  What is mikes net casualty and theft loss deduction

Assume also that in November 2013 Mike's home was burglarized. Mike's antique music box collection held for investment was stolen. Mike's basis in the collection was $8,000 and it was worth $15,000 at the time it was stolen.

  Analytical exercisescenario abc company sells widgets in

analytical exercisescenario abc company sells widgets in three varieties red yellow and blue but has lost money for

  Prepare the standard cost sheet for the company

Prepare the standard cost sheet for the company and compute the direct material price variance, assuming the material price variance is the responsibility of the company's purchasing agent.

  Calculating salvage value

Calculating Salvage Value. Consider an asset that costs $640,000 and is depreciated straight-line to zero over its eight-year tax life. The asset is to be used in a five-year project; at the end of the project, the asset can be sold for $175,000.

  Compute the equivalent units of production for each input

Compute the equivalent units of production for each input.

  Grate care company specializes in producing products for

grate care company specializes in producing products for individual grooming. the company operates six divisions adding

  Compute the total cost of the work in process

Compute the total cost of the work in process inventory on January 31 and compute the cost of jobs completed during January, and present the proper journal entry to reflect job completion.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd