Reference no: EM131061393
THIS IS THE TOPIC/SUBJECT OF MY PROJECT- An iOS Project Management Strategy that Works (https://blog.veniceconsulting.com/ios-project-management-strategy/)
Part A: Project Schedule
1. In Assignment, you developed a project plan. Now, using the information from your project proposal, create a multi-level work breakdown structure (WBS) and detailed project schedule.
Your project must include the following criteria:
-The project must consist of at least twenty-five (25) tasks.
-Each task must contain a start date, a finish date, and have main staffing and non-staffing resources assigned.
-Assume that your work activities are completed during normal weekdays (no weekend work) under normal conditions (8 hours per day).
-In terms of holidays, you can assume no work will be done the following days: New Year's Day, President's Day, Good Friday, Good Monday, Friday before Memorial Day, Memorial Day, the business day before Independence Day, Independence Day, the Friday before Labor Day, Labor Day, the day before Thanksgiving Day, Thanksgiving Day, Black Friday (day after Thanksgiving), the business day before Christmas, Christmas Day, the business day after Christmas Day, and New Year's Eve.
Part B: Written Response
Write a one to two (1-2) page response in which you:
1. Analyze your project in terms of project completion, critical path, and slack / float. Specifically, be sure to answer the following:
When will the project be completed?
What is the critical path for the project?
How much slack / float is in your project? What activities have the greatest slack / float?
2. Summarize the recommendations or improvements you would make to your project schedule. Specifically, be sure to answer the following:
Identify the top three (3) activities that you believe could impact the project completion date.
What additional activities would you add to this project to make it more complete, from a project management viewpoint?
Comparing the central tendencies
: What conclusion can be derived by comparing the central tendencies of the two data sets?
|
What is the total filtering area required to deliver 30 ft3
: what is the total filtering area required to deliver 30 ft3 of filtrate in 1/2 h?
|
Slowdown in chinese economy
: The Chinese economy has been rapidly growing and is now the 2nd largest economy in the world. The size of such economy means that it bears significantly many effects on the global commodity price and global trade.
|
What is the decision rule
: A sample of 64 observations is selected from a normal population. The sample mean is 215, and the population standard deviation is 15. Conduct the following test of hypothesis using the .025 significance level.
|
Create a multi-level work breakdown structure
: In Assignment, you developed a project plan. Now, using the information from your project proposal, create a multi-level work breakdown structure (WBS) and detailed project schedule
|
Estimate the standard devialtion of ages
: Out of a total of 10 college textbooks estimate the standard devialtion of their ages if the oldest textbook is known to be 7.9 years old and the newest textbook is 1.3 years old.
|
Probability that the avearage age
: What is the probability that the avearage age of these 40 airplanes is at least 14 years old? Round 4 decimal places. Remeber round ypur z-value to 2 deciimal places.
|
Servings of dairy products per day
: A reporter on the evening news stated the following: "Results from a new study were released today. In this study, participants who consumed 4 servings of dairy products per day had significantly higher cognitive functioning (p
|
Prepare a skeleton outline and a detailed outline
: Prepare a skeleton outline and a detailed outline
|