A 3-m-thick, wide fill (γ = 19 kN/m3) is placed over a soil profile consisting of 6 m of plastic clay (γ = 16 kN/m3, e0, = 1.7, Cc, = 1.2, OCR= 1.4, Cr/Cc, = 0.15) over 10 m of organic silt (γ = 16 kN/m3, e0, = 1.2, Cc, = 0.8, OCR = 1.0, Cr/Cc = 0.1, and Ca/Cc, = 0.06) over dense sand. The water table is at the surface of the plastic clay. Compute the settlement resulting from:
(a) primary consolidation of the plastic clay, and
(b) consolidation of organic silt after 30 years assuming that primary consolidation is completed in 7 years.
Let the cross - sectional area of the tube be given by A and the position of the cylinder by s , and assume that the compressed gas is an ideal gas at constant temperature so that the pressure P times the volume is a constant
Airport plans to build a newparallel taxiway on the north side of the airport beween runways.the purpose of building the taxiway is to reduce runway incursionsand make the airport safer. the total future cost of planning,design, and construction is e..
A river flows towards a lake with a velocity of 3 m/s and rate of 500 m3/s at a location of 90 m above the lake surface. Determine the total power generation potential of the river at that location.
Determine the mass of the earth knowing that the mean radius of the moons orbit about the earth is 238.910mi and that the moon requires 27.32 days to complete one full revolution about the earth
Input parameters for the function should be the lower and upper bounds of the root. Obtain reasonable values for the lower and upper bounds by graphing the function in Excel. Turn in your code for the VBA function.
Test reveal that a normal driver takes about 0.75s before he can react to a situation to avoid a collision. It takes about 3 seconds for a drunk driver to do the same. If such drivers are traveling on a straight road
A temporary diversion has been constructed on a highway of +4 percent gradient due to major repairs that are being undertaken on a bridge. The maximum speed allowed on the diversion is 10 mph
The median value of the rupture strength was 300 MPa. The ceramic is to be used for components with dimensions l=50mm, b=d=5mm loaded in simple tension along their length. Calculate the tensile stress that will give a probability of failure of the..
A 2-lb sphere A is moving to the left with a velocity of 40 ft/swhen it strikes the inclined surface of a 5-lb block B which is atrest. The block is supported by rollers and is attached to a springof constant k=12 lb/in.
Assuming the center of gravity of the student aligns with the axis of the pole and the pole has an elastic behabior, how high can they climb (in meters, m) just before the pole buckles
A variable-order reaction A-->B has the following rate expression: R(a) = -kC(a)/(K+C(a)) where k = 5mg/L-hr and K=40mg/L The reaction is to take place in a batch reactor. The initial concentration is 450 mg/L
a 520 ft long equal tangent crest vertical curve connects tangents that intersect at station 340 00 and elevation 1325 ft the initial grade is if 4 and the final grade is 2.5 determine the elevation and stationing of the high point PVC AND PVT
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd