The construction of a multi storied building started in January 1989 & was completed in June 1990. The total consolidation settlement of the building was estimated to be 8 cm. The average settlement of the building was measured in December 1991 & was found to be 2.2 cm. Compute the probable settlement of the building in January 2001.

Please provide reasons in every steps.

Reference no: EM13535610

Questions Cloud

Identify the contaminants on site and explain : Identify the contaminants on site and explain their hazards in relation to the proposed design and its construction. Describe the ‘In-situ’ and Ex-situ’ treatments that could be used and their relative merits
Briefly outline with the use of neat labelled sketches : It is proposed to make a new pedestrian access running directly south from University Square to Silvertown. The physical barriers that need to be overcome are the Royal Docks and the City Airport runway.
Determine the pressure between the sleeve and cylinder when : Maximum shear stress both in the tube and sleeve is 16000 psi. Calculate the fluid pressure, and determine the pressure between the sleeve and cylinder when the fluid pressure is absent.
What is normally consolidated clay : Compute the nominal shear strength of an M10 x 7.5 of A 572 grade 65 steel
Compute the probable settlement of the building : The construction of a multi storied building started in January 1989 & was completed in June 1990. The total consolidation settlement of the building was estimated to be 8 cm.
Determine the quantify the losses in this system : At Point A, in a pipeline carrying water (γ=62.4 lb/ft^3) the diameter is 4.0 ft, the pressure is 10 psi, and the velocity 4 ft/s. At point B, 6ft higher than point A, the diameter is 2 ft and the pressure is 2ps
What is the average crack spacing for that reinforcement : Compute the effective composite modulus of subgrade reaction (please consider the subbase, the presence of a relatively shallow rock foundation, and the potential loss of support)
Develop a preliminary design, including flow rates : Develop a preliminary design, including flow rates, pipe sizes, and pipe slopes for a trunk sewer to be laid in the development shown in the accompanying figure from 6th to 1st Streets along Peavy Avenue.
Compute the atomic packing factor for cesium chloride : Compute the atomic packing factor for cesium chloride assuming thatthe ions touch along the cube diagonals. Ionic radii ofCs+ and Cl- are 0.170 nm and 0.181 nm,respectively

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  What is the length of steel tape having cross-sectional area

What is the length of a 200 ft. steel tape having a cross-sectional area of 0.004in2 and a modulus of elasticity of 30,000,000 lb/in2 that is standardized at a tension of 20 lb and a temperature of 68°F

  Calculate the ph of the solution

A 1.50 L buffer solution is 0.250 M in HF and 0.250 M in NaF. Calculate the pH of the solution after the addition of 0.0500 moles of solid NaOH. Assume no volume change upon the addition of base. The Ka for HF is 3.5 x 10-4.

  Estimate the boundary layer thickness at the end of train

The flow over the train is similar to flow over a flat plate. Estimate the boundary layer thickness at the end of the train, which is 125 m long. The temperature is 10°C.

  What should the removal efficiency of a process designed

Wastewater flow of 2000 m3/day containing 120g/L of salt. Discharge into a river with a flow of 34,000 m3/day and a salt concentration of 50 mg/l. The agency wants to maintain the salt level to no greater than 250 mg/L downstream of the discharge.

  The question asks for the magnitude and direction

The question asks for the magnitude and direction at the pin Aand int the cable BC needed to support a 500-lb ball load. The boomweight AB is neglected. AB is 8ft long and angled at 35degrees. The cable BC has an angle of 22 degrees and the500-lb bal..

  Determine the pressure at a stagnation point on that stream

At a given point on a horizontal streamline in flowing air, thestatic pressure is -2 psi (ie vacuum) and velocity is 150 ft/s.Determine the pressure at a stagnation point on thatstreamline?

  Find which is less than the maximum taxable wage base

Find an equation that expresses the relationship between the wages earned (x) and the Social Security taxes paid (y) by an employee who earns less than the maximum taxable wage base.

  Photovoltaic array and under insolation conditions

Photovoltaic array, Under insolation conditions of 500 W/m^2 (direct sunlight), and 10% solar cell efficiency

  Determine what is the total resistance of the loads

You have 4 resistors (loads) in parallel. What is the total resistance of those loads The loads are as follows 4ohms, 6ohms, 16ohms and 1 ohms. When calculating 1/R, round to the fourth decimal point. Percentage of error margin is 0.5

  Determine the angle of rotation and deflection at end a

An overhanging beam ABC is subjected to a couple MA at the free end (see figure). The lengths of the overhang and the main span are a and L, respectively. Determine the angle of rotation and deflection at end A.

  Determine the angle of twist of gears a and c

The 60mm diameter shaft ABC is supported by two journal bearings, while the 80mm diameter shaft EH is fixed at E and supported by a journal bearing at H. If T1= 2 kN*m and T2= 4 kN*m

  Find what is the pressure on the soil if theta is 45 degrees

A pipe is to be installed under the ground on a bed of aggregate 6 in. thick. The entire weight on the aggregate from pipe and soil above the pipe is 1800 lbs. per linear foot of pipe. What is the pressure on the soil if theta is 45 degrees

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd