Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Water at a flow rate of 1 kg/s is flowing in a pipe of internal diameter 5 cm. If the inside pipe surface temperature is 90 degrees C and mean bulk water temperature is 50 degrees C, compute the convective heat transfer coefficent.
The PVC pipe weighs 36.1 pounds per foot of length. Determine the minimum uniform thickness (in) of concrete (150 lbs/ft^3) required around the exterior of the PVC pipe to prevent the empty pipe from floating.
If the Greenshields model describes the relationship between speed and density on the highway, the jam density of the highway is 112 veh/mi, and the mean free speed is 64.5 mph,
The SO2 emission from a fixed source is 25 g/s. The effective stack height is 60 m, the wind speed is 4 m/s at the top of the stack. Assuming class C stability, what is the expected ground level concentration 2 km downwind
If the maximum total acceleration of the train must not exceed 1.5 m/s^2, determine the shortest distance in which the train can reach a speed of 72 km/h, and determine the corresponding constant rate of acceleration at.
A train which is traveling at 80 mph applies its brakes as it reaches point A and slows down with a constant deceleration. Its decreased velocity is observed to be 60 mph as it passes a point 1/2 miles beyonds A.
The position of a particle moving along an x axis is given by x = 17t2 - 5.0t3, where x is in meters and t is in seconds. (a) Determine the position, velocity, and acceleration of the particle at t = 3.0 s. x = m v = m/s a = m/s2
The soil properties of the clay are Cc = 0.25, Cr = 0.05, gsat = 18 kN/m 3 , for the sand gsat = 18 kN/m 3 , and the water table is 2 m below the soil surface. Determine the settlements when a stress of 100 kPa is applied by the building over an a..
Water leaves a reservoir at 0.05 m^3/s through a 200-mm riveted steel pipeline that protrudes into the reservoir and then immediately turns a 90º bend with a local (minor) loss coefficient equal to 0.3.
determine the horizontal spacing of the vertical drains if the drains are installed in triangular grid to reach 90% of primary consolidation in 1.5 years after the commencement of fill placement
one of the wells pumps at a rate of 1240 m3/day. the second well pumps at 850 m3/day.if the aquifer has a transmissivity of 2000 m2/day and a storage coefficient of 4x10^-4, when would the wells start interfering with each other.
Three days later, Abu sees his solicitors and executed the transfer of his said bungalow to Abdul Samad at the said value. Two month later, Abdul Samad expelled Abu from the religious group. Abu now wants to set aside the sale of his bungalow.
assume hydrostatic uplift varies uniformly from full hydrostatic head at the heel of the dam to zero at the toe. consider 1m length of dam.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd