An engineering mistake has resulted in the need to connect an already constructed tunnel and bridge with a vertical curve. The profile of the bridge and tunnel. Devise a vertical alignment to connect the tunnel and bridge by determining the highest common design speed for the sag and crest (equal tangent) vertical curves needed. Assume that the final grade of the sag curve equals the initial grade of the crest curve. Compute stationing of PVC, PVI, and PVT curve points.
Create a MATLAB program and flowchart which will allow the user to input an unknown number of temperatures, each of which might be a temperature in Celsius, Fahrenheit, Kelvin, or Rankine, and will convert the user input temperature to each of the..
To remove a nail, a small block of wood is placed under a crowbar, and a horizontal force P is applied as shown. Knowing that the maximum vertical force needed to extract the nail is 2600 N and that the horizontal force P is not to exceed 290 N, d..
The soil will be excavated from the borrow pit, moistened to increase the water content to 13.5% (assume i will not change the volume of solid mass) and then compacted to a final dry unit weight of 118 pcf.
The gate is rectangular with a horizontal width of 2m perpendicular to the paper. For a depth h = 3m of water, calculate the required force exerted by the hydraulic cylinder to keep the gate just closed.
The coefficient of friction between the crate and the floor is µs = 0.4 and µk = 0.3. If P is slowly increased until the crate starts to move and then remains constant, determine using energy methods the speed of the crate after moving 2 m.
A power plant operates at steady-state. It receives energy from a hot source (combustion of fuel) at a temperature of 420 oC. The plant discharges this energy to a nearby river that acts as a cold source.
a tape is calibrated and found to measure 100.04ft between the 0- and 100-ft marks. what measurements should be laid out to establish a horizontal distance of 682.25ft
In Singles badminton game, shuttle is smashed by Player A from close to base line, which is 6 m from the net. Height of the net to be cleared by a smash is 1.55 m. The shuttle is hit by player A at a speed of 250 km/h.
Estimate teh excess solids production of an extended aeration process treating unsettled wastewater with a BOD of 200 mg/l and suspended solids concentration of 240 mg/l, assuming k=0.35.
A membrane biological treatment plant effluent must be disinfected to what level prior for use as unrestricted recycled water. For a flow of 4 mgd and peak flow of 6 mgd, how many lamps are required
A company borrowes $25000 at an interest rate of a nominal 16% per year compounded quarterly. The company desires to repay the loan in 36 equal quartely payments, with the first payment starting three months from now.
Design a hardwood beam to support a uniformly distributed load of 20 kN over a simply supported span of 8 m. consider bending strength only. Assume that the weight of the beam is 2 kN.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd