Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Q. 1. A leading industrial consultant reports that management often permits a standard to be bargained instead of measured, or it permits a man to do the job his own way instead of the best way. The consultant opined that both practices are bad. Illustrate what is wrong with these practices?
2. In a women's clothing industry, dress manufacturers cut cloth for exactly the number of dress ordered, then any faulty dresses which can't be repaired become shortages in the order to the customer also not replaced.
Isn't this a good practice for all companies to use? Illustrate what problems would it make in the dress industry, in other industries?
3. Illustrate what is the pull of the factory? Illustrate what has it got to do with production control?
4. Are machine loads also schedules the same thing? If they are different, where should each use?
5. Illustrate what are the problems in scheduling work in a assembly line production covering automatic batch manufacturing? Compare with flexible manufacturing system.
For this Discussion Forum, please document all of the steps needed to create a specific strategic group map for the beer industry. Then create a strategic group map, based upon the following industry definition:
In the judgment of Deedee's superiors she has "topped out" and will not be qualified for further advancement. Which of the following statements is most appropriate for Deedee's situation.
Develop a scope statement for this project which contains examples of all the elements. Assume which the event will occur in 4 weeks also provide your best guess estimate of the dates for milestones.
The coffee breaks are staggered, starting at 90 min into every shift. Meal breaks also staggered starting 3.5 hrs into every shift. Create a simulation model of this system. In the simulation, draw a simple layout of the above system.
Graphically decide a daily production plan that minimizes the cost of meeting Leary Chemical's daily demands.
Describe B2B technologies also applications also ways B2C can use technology to utilize e-business strategies.
Elucidate how many customers, on average, are waiting in line in front of each service desk. Elucidate how much time does a customer spend at the service desk (waiting plus service time).
company wants to forecast demand using the weighted moving average.
The organization has $200,000 in outstanding senior loans already which pays 6% interest also decides to issue $100,000 in preferred shares also $200,000 in common stock in order to finance its growth.
Fresh Foods is considering exchanging the locations of the dry groceries department (A) also the health also beauty aids department (F). Compute the LD score for Fresh Foods' present also proposed layouts.
llustrate what is process cycle time of overall system. If firm operates 8 hours per day, 20 days per month, illustrate what is monthly capacity of manufacturing process.
Gross profit is $40 per car per day rented. When re is demand for a car when n1 is available re is a goodwill loss of $80 and rental is lost. Each day a car is unused costs you $5 per car. If your industry can obtain another car for $200 for 10 da..
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd