Compare the total reactor volume required for 90% removal of

Assignment Help Civil Engineering
Reference no: EM13559054

1.Compare the total reactor volume required for 90% removal of a substance that decays according to first-order kinetics with a rate constant of 0.05 day –1 in a CM system that contains a single reactor against a system that contains three CM reactors of equal volume in series.

2.An activated sludge plant is to be designed for a population of 4000 persons. The influent flow is 380 Lpcd and the influent BOD5 is 200 mg/L. Pertinent data are: Primary clarifier removes 33% of the influent BOD5, and the state regulatory agency allows a volumetric loading of 0.48 kg BOD5 /(m3.day). Determine the reactor basin volume.

Reference no: EM13559054

Questions Cloud

How many trucks are required and what is the production : On a shovel/truck operation the production of the shovel is 293 BCY/h and a job efficiency of 0.75. The trucks used have a capacity of 12 BCY and have a cycle time of 45 min.(excluding loading).
How long does it take this object to pass the ship : a spaceship whose rest length is 350m has a speed of .82c withrespect to a certain reference frame. how long does it take this object to pass the ship
What is the equivalent pf rate constant that would be used : As more complete mixed reactors in series are provided, the system becomes more plug flow. For a substance that decays according to first-order kinetics
What forces are seponsible for thee quilibrium : During the final stages of descent, asky diver with an openparachute approaches the ground with a constant velocity. what forces are seponsible for thee quilibrium
Compare the total reactor volume required for 90% removal of : Compare the total reactor volume required for 90% removal of a substance that decays according to first-order kinetics with a rate constant of 0.05 day –1 in a CM system that contains a single reactor against a system that contains three CM reactors ..
Estimate what is the position of the block : A block lies on a horizontal frictionless surface and isattached to the free end of a spring, with a spring constant of 60N/m. What is the position of the block
Estimate the hourly production and unit cost of rock : Estimate the hourly production and unit cost of rock excavation by drilling and basting. The rock is limestone having a seismic velocity of 6000 ft/s.
How many grams of ethane remainin the flask : A flask with a volume of 1.50 L, providedwith a stopcock, contains ethane gas (C2H6)at 300 K and atomospheric pressure (1.013 x 105Pa). How many grams of ethane remainin the flask
Literature review and report : Literature Review and Report

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the return and the risk associated with purchase

A new machine will cost $25,000. The machine is expected to last 4 years and have no salvage value. If the interest rate is 12%, determine the return and the risk associated with the purchase.

  What is maximum weight of crate that system can support

Rope BCA passes through a pulley at point C and supports a crate at point A. Rope segment CD supports the pulley and is attached to an eye anchor embedded in a wall.

  Determine the value of the froude number for

An important dimensionless parameter in certain types of fluid flow problems is the Froude number defined as V/(gl)^1/2 where V is a velocity, g the acceleration of gravity, and l a length

  Find the resistive force exerted by the water on the boat

Each exerts a force of 600 N directed at a t= 20.0° anglerelative to the forward motion of the boat. If the boat moves withconstant velocity, find the resistive force exerted by the water on the boat.

  Design speed station of the pc station of the pt deflection

A horizontal Curve is designed for a two lane mountainous terrain. The following data are known. intersection angle: 40 degrees tangent length: 436.76 ft Station on PI: 2700+10.65 fs=0.12 e=0.08

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Determine the vertical stress increment due to the strip

Determine the vertical stress increment due to the strip load and the total pressure both at point 3 m below the center of the strip load.

  What is chemical name of first hazardous air pollutant

What is the chemical name of the first hazardous air pollutant under Title III regarding the Clean Air Act

  Dram and sketch the system. include coordinate system

A plate is pulled upward from a pool of liquid with velocity, V, entering a thin liquid film on the surface of the plate. The flow is assumed to be laminar and the film thickness

  Determine the tension in the support cable

A sailor is being rescued using a boatswain's chair that issuspended from a pulley that can roll freely on the support cableACB amd is pulled at a constant speed by cablle CD

  How many double-tracked sections are needed to allow trains

A light rail transit agency operates trains over a 25-km long single-track line. During the peak period, it operates five trains at 15-min headway. Train travels at an average speed of 50 km/hr.

  Determine what is the gage pressure below the liquid surface

A liquid has the peculiar property that its mass density increases linearly with depth according to the expression p = p_water (1+0.01d) where d is the depth below the liquid surface in meters.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd