Reference no: EM13312493

In this scenario, assume that you are working at Clean Insure Solutions, a software company providing software solutions for insurance brokers inEurope. You are the project manager for the launch of a new product, an enhanced version of the company’s Broker EN-Sure product. Your company is banking on the success of this new product release to increase its market share inEurope. New product features will give distinct edge over its competitors and help drive the sales aggressively. Time to market is also a critical factor in meeting the business expectations. As a result, this project has a very high visibility with senior management.

Broker EN-Sure requires many new features to be acceptable to its potential consumers. The list of high-level project activities is as follows:

1. Creating requirement understanding document based on customer inputs

2. Creating a product feature list with short descriptions for approval by senior management

3. Conducting detailed analysis of the proposed product features with guidelines for software coding and development

4. Creating a business architecture for Broker EN-Sure

5. Creating a technical architecture for Broker EN-Sure

6. Securing approval for architectures from the design review board in the organisation

7. Creating a schedule of features to be developed during each phase of the project. The schedule will have a list of features to be completed and details of the project team.

8. Creating a quality management plan for the software development effort

9. Securing approval on the schedule and the quality management plan

List of activities durations and there dependencies:

Reference no: EM13312493

Questions Cloud

What is the inductance : An RLC circuit consists of a 48 ohm resistor, 240 micro farad capacitor, and an inductor. What is the inductance
What is the average power of the elevator motor : A 668-kg elevator starts from rest and moves upward for 4.30 s with constant acceleration until it reaches its cruising speed, 1.65m/s. What is the average power of the elevator motor
Compute voltage for a concentration cell : Using the Nernst Equation, calculate the voltage for a concentration cell with: Cu (s)| 0.01 M Cu2+|| 1.0 M Cu2+| Cu (s)
Prepare and explain an efas table for samsung : Prepare and explain an EFAS table for Samsung
Clean insure solutions : In this scenario, assume that you are working at Clean Insure Solutions, a software company providing software solutions for insurance brokers inEurope. You are the project manager for the launch of a new product, an enhanced version of the company’s..
Find the average power delivered to the train : Please help me solve this problem: The electric motor of a model train accelerates the train from rest to 0.600 m/s in 33.0 ms. Find the average power delivered to the train
Find the mass of the second child : Suppose a 29.5 kg child sits 1.89 m to the left of center on the same seesaw as the problem you just solved. Find the mass of the second child
Calculate the concentration of pm in the stack at conditions : A stack (T=550*F and P=750mm Hg) was sampled using EPA Method 5. The total gas volume that flowed through the dry gas meter was 2.785 cubic meters (at T=60*F and P=800mm Hg). The mass of particles collected was 1.50g.
Construct a flyover in the city to ease traffic congestion : The project manager on a project to construct a flyover in the city to ease traffic congestion. Flyover construction should cause minimum disruption to the traffic until it is complete. Ensuring safety of the commuters and workers at the site is the ..

Reviews

Write a Review

 

Project Management Questions & Answers

  Evaluate the total cost of plan

Operations Management-Aggregate production planning - Evaluate the total cost of this plan.

  Checklist versus weighted factor method of selecting project

Show the pros and cons of the checklist versus the weighted factor method of selecting projects - Important information about checklist versus the weighted factor method

  Which company paid its employees to volunteer

Which company paid its employees to volunteer in their communities two days a week after a tsunami in Japan disrupted operations at its U.S. facilities?

  Developing a list of key success indicators

Develop a list of "Key Success Indicators" that could and should have been measured on completion. Rank them in order of priority for this project.

  Evaluate the use of complex models of project risk

Critically analyse the concept of risk; discuss how it can be measured and ranked and outline how a project risk management strategy may be constructed.

  Create a detailed schedule for project

Using a template or Microsoft Project, create a detailed schedule for the project you chose. Then, prepare another detailed schedule that crashes your project duration by nine months.

  Change management and changing scope of a project

What are the possible implications of this change request and what is one of the basic tools for managing changes?

  What is the contribution margin per unit

Contribution Margin per unit explained in this solution - What is the contribution margin per unit?

  Project management- changes to baseline

Project management: Changes to Baseline - when would a project manager not allow changes to a baseline?

  What are the key aspects of project management

Review the Project Management at Six Flags video, and readings and answer the following: What are the key aspects of project management, and how do they relate to your job as a nurse? Support your viewpoint by quoting examples from the video and read..

  Discuss security elements of a infrastructure projects

Based on your analysis of the Required Resources for this week, discuss three safety or security elements that you feel can be generalized to the planning of a variety of infrastructure projects.

  It project managers and traditional project managers

Then what is the difference between IT project managers and traditional project managers if there are so many similarities in project management discipline?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd