he controller predicted the following costs at various levels of wine output:

wine output (0.75 litre bottles)
10000 bottles 15000 bottles 20000 bottles
variable production costs 44,400.00 66,600.00 88,800.00
fixed production costs 120,000.00 120,000.00 120,000.00
fixed selling and admin costs 48,000.00 48,000.00 48,000.00
Total 212,400.00 234,600.00 256,800.00

The marketing manager predicted the following prices:
10000 bottles 15000 bottles 20000 bottles
sales price per 0.75 litre bottle 21.6 18 14.4

1 Calculate the unit costs of wine production at each level of output. At what level of output is the unit cost minimized?

2 Calculate company's profit at each level of production. Assume that the company will sell all of its output. At what production level is profit maximized?

3 Which of the three output levels is best for the company?

4 Why does the unit cost of wine decrease as the output level increases?

Reference no: EM1336022

Questions Cloud

Describe basic types of strategic control : Describe basic types of strategic control  (a) premise control (b) special alert control (c) strategic surveillance and (d) implementation control.
What are the methods for measuring performance : Methods for Measuring Performance - What are the major methods for measuring performance?
Organizational and interpersonal variables : What techniques could be employed to improve communications throughout the organization and create a more harmonious work environment?
Illustrate what is an investment schedule and how : Illustrate what is an investment schedule and how does it differ from an investment demand curve.
Calculating company-s profit at each level of production : Calculate company's profit at each level of production. Assume that the company will sell all of its output. At what production level is profit maximized?
Differentiate from domestic hrm challenges : Can you please describe how the items you listed for IHRM really differentiate from Domestic HRM challenges
Why database re-engineering and redesign is required : define what should be done when adding tables and relationships for normalization.
Explain how the economy affects the success : Explain how the economy affects the success of the auto industry. Economic influences that can affect the industry in a negative way.
Describe the goal setting theory : Describe the goal setting theory and why does goal setting increase motivation?

Reviews

Write a Review

Project Management Questions & Answers

  Drawing the total cost lines

Draw the total cost lines for the three options.

  Deming-s theory on quality embraced by japanese industry

Why was Deming's theory on quality embraced by the Japanese auto industry and rejected by the American auto industry?

  Case study of masters corp

Masters Corp. has two bonds with 20-years remaining until maturity. Both bonds are unsecured and are callable at $1,050. Bond A was issued 20 years ago with a coupon rate of 6%. Bond B was issued 10 years ago with a coupon rate of 8%.

  Create a detailed schedule for project

Using a template or Microsoft Project, create a detailed schedule for the project you chose. Then, prepare another detailed schedule that crashes your project duration by nine months.

  Project-s critical success factors and inherent risks

Discuss the relationship between a project's critical success factors and inherent risks.

  Project audits conducted in organization

Are project audits conducted in your organization? Why or why not?

  Rationale behind time and cost estimation methods

Explain the rationale behind time and cost estimation methods and why you would chose one method over another.

  Alternatives-project organization can use to respond to risk

What are the four alternatives a project organization can adopt in deciding how to address and respond to its risks?

  Prepare a monthly profit report

Prepare a "Monthly Profit Report", Create this report using the results of your ABC overhead allocation.

  Determining sales contracts

Provide a well written answer of not less than 200 words to the following. Weaver Mills Co. in Country F contracted to purchase 100,000 yards of jute from Natural Fiber Co. in Country G at US$ 0.64 per yard. Natural delivered 22,228 yards

  Development of project software and methods of scheduling

How does the development of project software compare to other methods of scheduling.

  Depreciation is based on the asset cost

Depreciation is based on the asset cost plus all of the following except:

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd