Mike is preparting the x-bar chart and the R chart for Uncle Ben's 2lb. box rice packaging line. Using the standard sample size of 9 items. Mike found the average range is .02 lbs and the overal process average is 1.98 lbs.
Calculate the upper and lower control limits for the process average chart
calculate the upper and lower control limits for the range chart
a random sample of four items as an average weight of 2.2 lbs and a range of 0.03 lb is taken by the quality manager. Based on your calculations explain why these results are not acceptable for both average and range.
Illustrate what steps/actions would an organization take to decide whether the transportation activity has the appropriate internal competencies to achieve competitive advantage.
Does feasibility analysis investigate economic, organization, technical, resource, also schedule feasibility. Illustrate what are capacity implications of marketing campaign (assume no learning).
Compute the takt time for a system where the total time per shift is 400 minutes, there is one shift, and workers are given two 20-minute breaks and 30 minutes for lunch.
Scheduling techniques are designed to disaggregate the master production schedule into time-phased daily or hourly activities. A detailed production schedule must include when and where each activity must take place in order to meet the master schedu..
Pine and Acorn's human resources manager Harry informed Laura that she had evaluated most of her subordinates similarly as doing average or above-average work.
Elucidate how appropriate might a just in time inventory system be for a product such as roller skates. Illustrate what opportunities are therefore Rollerblade managers to see themselves as selling services, instead of simply roller skates.
A small family-owned restaurant uses a seven-day moving average model to determine manpower requirements. These forecasts need to be seasonalized because each day of the week has its own demand pattern.
The upper and lower limits for diving ring diameters made by John's Swimming are 40 and 39 cm. John took 11 samples with the following average diameters (39, 39.1, 39.2, 38.9, 39.4, 39.5 39.6, 39.7, 39.8, 39.9, 40.1). Is the process in control?
The percentage of value of shipments that come from materials for the average manufacturer is, Fed up with her working conditions at the call center.
Keep in mind which every warehouse does not have to be used. Formulate an LP program also solve this problem.
Illustrate what is expected (i.e. mean) project completion time. Standard deviation of completion time. Illustrate what is probability project will be completed in time for Kozar to begin marketing new product within 24 months.
choose a product you would create and decide whether you would take a slow or fast approach internationalizing your firm.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd