Application: Time-Value Formulas and Cost-Benefit Analysis

Governments are concerned primarily with real prices rather than "shadow prices," or prices that have been "assigned" to intangible costs and benefits. A major budget management function is cost-benefit analysis. When coupled with the use of time-value formulas, decision making related to operational expenditures is facilitated. Cost-benefit analysis is a means of evaluating all costs on a dollar basis, even those costs that do not have a dollar value attached to them. After all other calculations have been made, the analysis needs to conclude with the calculation of the ratio between costs and benefits. The results aid decision makers in considering multiple avenues for expenditure. This week, you practice the principles and related formulas of time- (present) value and cost-benefit analysis.

Scenario 1: Present-Value Calculation

Using the present value time-value formulas to calculate the future cost of goods and services is one way to produce more realistic prices. In this Application, you practice using a time-value formula to determine future prices.

The following simple, present-value formula shows the effect of discounting on the cost of a public policy. In the formula, the discount rate will be set at:
(1 + r)time where:
1= a constant
r = a selected interest rate
time = a period of time, usually a year
The formula is:
Cost or Benefit
(1+r)time
The calculation occurs like this example of $1,000 over 2 years discounted at 10%:

$1,000

(1+10%)2

=

$1,000

(1.1)2

=

$1,000

1.21

=

$826.44


Consider the following scenario:

A city wants to open a recycling center aimed at reducing waste. The total benefits of the program are valued at $1,000,000. Three different discount rates are estimated at 5%, 6%, and 7%. The time period for receiving the benefits of the program is two years.

Scenario 1 tasks:

- Calculate the present value at each interest rate.

- Note and discuss what happens to the present value at each interest rate.

Scenario 2: Cost-Benefit Analysis

Note: Scenario 2 is a separate calculation. Scenario 2 is not influenced by the results of Scenario 1.

In doing the following exercise, please refer to the discussion in pages 319-333 of Chapter 7 from Mikesell'sFiscal Administration on cost-benefit and cost-effectiveness analysis. Cost-benefit analysis is a technique that assumes all costs and benefits can have a dollar value attached to them. It is a tool and should not be used as the sole basis for decision making. The result of a calculation is a ratio between costs and benefits. After all other calculations have been made, the analysis needs to conclude with the calculation of the ratio between costs and benefits. If the ratio costs exceed benefits, the project advice is to not accept the project and to consider accepting the project if benefits exceed costs.

Consider the following example from the fictitious Swobodaville's efforts to build a Community Windmill Renewable Energy Project. The following has been agreed upon:

1. Land is already owned. The price of a new is windmill is $150,000. A minimum of 50 windmills are needed to achieve desired efficiency compared to the current coal-burning method.

2. Staff training costs over three years when considering direct costs, including loss of productive hours while in training, will be $55,000 for each of the 10 specialists to be hired.

3. The annual operating and maintenance costs of the machine in the three-year period will be $35,000 per windmill.

4. The cost of shutting down a portion of the coal plant to achieve the same energy production as the windmills is $1,000,000.

5. Three full-time coal workers will lose their jobs as a result of the transition. Their hourly wage is $35 per hour and they work 2,080 hours annually.

6. As a widely supported community project with an investment in every aspect of the community's well being, quality of life expected from reductions in pollution is considered in the cost calculation. The medical center that conducted an analysis has concluded that the value of increased life expectancy should be included as a benefit to the community. The quality of life of 5,000 residents is expected to be increased by an average of dollars over three years. The average benefit of a resident (including all men, women, and children) over a three-year period is estimated to be $1,500.

7. The three-year savings on other pollution damage to buildings and grounds, calculated by the Sierra Club, is $7,000,000.

Scenario 2 tasks:
- Calculate the cost-benefit ratio.
- Explain whether the ratio is positive or negative.
- If positive, explain if you would replace a portion of the coal-burning operation or the whole operation? Why or why not?

Support your Assignment with specific references to all resources used in its preparation. Be sure to follow APA guidelines when citing your sources.

Reference no: EM131368605

Questions Cloud

How you think buffett might have evaluated the costs : With these considerations in mind, explain how you think Buffett might have evaluated the costs and benefits of the following long investment strategies: purchased call, written put, long index swap, long index futures, written collar.
Write a paper about the american civil war : Write a paper about the American Civil War and make a argument for why it was necessary. It must be double-spaced (Times New Roman, font size 12), and include a cover page with your name, course number and course title, instructor's name, and dat..
Explain disciplinary process for national football league : Consult the collective bargaining agreement and be sure to distinguish between team discipline and league discipline as well as explain the NFL Commissioners role as well as the arbitration process and courts.
Methods of risk analysis-quantitative assessment : In this week's readings, you learned about two methods of risk analysis: quantitative assessment and qualitative assessment. Explain the steps taken to assess a risk from a quantitative perspective where monetary and numeric values are assigned an..
Calculate the present value at each interest rate : Calculate the cost-benefit ratio and explain whether the ratio is positive or negative - If positive, explain if you would replace a portion of the coal-burning operation or the whole operation? Why or why not?
Compute the delta and gamma for the paylater put : Compute the delta and gamma for the paylater put. Compare the behavior of delta and gamma with that for a COD. Explain the differences, if any.
State your thesis on how the discovery of america changed : "The discovery of America, and that of the passage to the East Indies by the Cape of Good Hope, are the two greatest events recorded in the history of [human] kind"-Adam Smith, in The Wealth of Nations, 1776. Think about why he and many other nota..
Explain how to read todays surface analysis chart : Given is the Surface Analysis Chart.- Explain how to read today's surface analysis chart.
What type of leader do you think you are or will be : Reflecting on your internship, what leadership style was used by your supervisor in your internship? What type of leader do you think you are or will be? What safety leadership style is best for the following; and why?

Reviews

Write a Review

 

Accounting Basics Questions & Answers

  Determine the net present value and indicate whether the

planning for capital investments is an important function of management. you are provided with the following data

  Requires of the chief executive officer

Outline what the Sarbanes-Oxley Act is and what impact it has on financial reporting. Discuss what Section 302 requires of the chief executive officer (CEO) and chief financial officer (CFO).

  Lily began business on january 1 2009 with an investment of

lily company had the following assets and liabilities on the dates indicated december 31 total assets total

  Is target corp''s credit too generous?

Is Target Corp's Credit Too Generous? Eavis, P. (Mar. 11, 2008). Is Target Corp.'s credit too generous? Wall Street Journal.

  Identifiable net assets problem

On April 1, 2011, BigBen Company acquired 30% of the shares of LittleTick, Inc. BigBen paid $100,000 for the investment, which is $40,000 more than 30% of the book value of LittleTick's identifiable net assets.

  What kind of data would be found in the master files

For an accounts receivable system, what kind of data would be found in the master files and transaction files, respectively?

  Adjusting entry to record accrued interest

Farmer Corporation borrowed $280,000 on November 1, 2009. The note carried a 10 percent interest rate with the principal and interest payable on June 1, 2010. Prepare the journal entry to record the note on November. Prepare the adjusting entry to..

  You are considering two options for producing a product

you are considering two options for producing a product that will sell for 100.option 1 will have variable cost 50 and

  What is nicoles getaway spas gross profit percentage

Prepare journal entries for each transaction. Calculate the amount of Net Sales and Cost of Goods Sold for the transactions listed above. What is Nicole's Getaway Spa's gross profit percentage (round to one decimal place)? Explain to Nicole what this..

  Compare the eva for briggs and stratton for 2007 and 2008

Briggs & Stratton Corporation is the world's largest maker of air-cooled gasoline engines for outdoor power equipment. The company's engines are used by the lawn and garden equipment industry.

  Which is closest to the present value of the project

Upper Darby Park Department is considering a new capital investment. The following information is available on the investment. The cost of the machine will be $150,000.

  Tim works as a pediatrician for the county hospital the w-2

tim and monica nelson are married file a joint return and are your newest tax clients. they provide you with the

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd