Airepart, Inc., produces two different types of subassemblies for the aircraft industry. Airepart produces a major component for the subassemblies in the cutting and welding department. Other parts and the manufactured component are then assembled in the assembly department. The activities, expected costs, and drivers associ- ated with these two manufacturing processes are as follows:

Process

Activity

Cost

Activity Driver

Expected Quantity

Cutting and

Welding

$ 2,000,000

Welding hours

4,000

Welding

Machining

1,000,000

Machine hours

10,000

 

Inspecting

Materials handling

70,000

52,000

No. of inspections

No. of moves

1,000

12,000

 

Setups

     400,000

No. of batches

100

 

 

$3,522,000

 

 

Assembly

Changeover

$ 28,000

Changeover hours

1,000

 

Rework

50,000

Rework orders

50

 

Testing

40,000

No. of tests

750

 

Materials

handling Engineering support

60,000

       70,000

No. of parts

Engineering hours

50,000

2,000

 

 

$ 248,000

 

 

Note: In the assembly process, the materials handling activity is a function of product characteristics rather than batch activity.

Other overhead activities, their costs, and drivers are as follows:

Activity Cost Activity Driver Quantity

Purchasing

$50,000

Purchase  requisitions

500

Receiving

70,000

Receiving orders

2,000

Paying suppliers

80,000

No. of invoices

1,000

Providing space and utilities

    30,000

Machine hours

10,000

 

$230,000

 

 

Other production information concerning the two subassemblies is also provided as follows:

  Subassembly A Subassembly B

Units produced

1,500

3,000

Welding hours

1,600

2,400

Machine hours

3,000

7,000

Inspections

500

500

Moves

7,200

4,800

Batches

45

55

Changeover hours

540

460

Rework orders

5

45

Tests

500

250

Parts

40,000

10,000

Engineering hours

1,500

500

Requisitions

425

75

Receiving orders

1,800

200

Invoices

650

350

The per-unit overhead costs using the 14 activity-based drivers are $1,108 and $779 for Subassemblies A and B, respectively.

Required

1. Determine the percentage of total costs represented by the three most expensive activities.

2. Allocate the costs of all other activities to the three activities identified in Requirement 1. Allocate the other activity costs to the three activities in proportion to their individual activity costs. Now assign these total costs to the products using the drivers of the three chosen activities.

3. Using the costs assigned in Requirement 1, calculate the percentage error using the ABC costs as a benchmark. Comment on the value and advantages of this ABC simplification.

Reference no: EM13949389

Questions Cloud

Used as the annual sales figure when evaluating this project : Travel America Coaches currently sells 15,000 motor homes per year at $94,000 each, and 1,500 luxury motor coaches per year at $159,000 each. The company wants to introduce a low-range camper to fill out its product line; it hopes to sell 3,000 of th..
Are these intervals more useful for planning your expansion : Run a regression of sales against local income (only). Based on this regression, give an interval that you are 95% confident will contain your sales in a neighborhood with total income $200M. Do you think this regression is useful for planning you..
What is the amount of kristi realized gain : What is the amount of Kristi's realized gain and recognized gain and the basis in her new property?
What is the wacc it should use for the project : Lawler's is considering a new project. The company has a debt-equity ratio of 0.62. The company's cost of equity is 15.1 percent, and the aftertax cost of debt is 8.8 percent. The firm feels that the project is riskier than the company as a whole and..
Calculate the percentage error using the abc costs : Using the costs assigned in Requirement 1, calculate the percentage error using the ABC costs as a benchmark. Comment on the value and advantages of this ABC simplification.
How many pounds of plastic does aja need to purchase in 2016 : The Aja Co. expects to produce 2,000 baskets in 2016. Each basket requires 2 pounds of plastic. Aja has 225 pounds of plastic on hand at the end of 2015, and it wants to have 190 pounds on hand at the end of 2016. How many pounds of plastic does Aja ..
Can terrence enforce the contract : Terrence, an adult, enter into a contract with Bobby, a 16 year old. Before either party changes position, Bobbys parents find out and tell Terrence the deal is off. Can Terrence enforce the contract
Why capm equation might be more relevant than other : Explain with a graph how SML is different from CML. Why CAPM equation might be more relevant than other equations when calculating required rate of return.
Assume spending will continue at the same rate : Your project is progressing well in your estimation. Your team has collected the following data. From these data, calculate the project’s ETC. Activity A is 60% complete at a cost so far of $50,000. It was estimated to cost $200,000 when finished. It..

Reviews

Write a Review

Managerial Accounting Questions & Answers

  How does matching concept affect accounting for fixed assets

How does the matching concept affect accounting for fixed assets? What factors must be known or estimated in order to compute depreciation expense?

  Project costs are related to procurement

Whena significant percentage of project costs are related to procurement,

  Cost and revenue variances of processors ltd

Processors Ltd. uses three different products - X, Y and Z to produce its major product line. Each kg of the raw material costs $2.00 for X, $3.75 for Y and $5.20 for Z.

  What are the equivalent units for materials

What are the equivalent units for materials for the month in the first processing department and what is The total cost transferred from the first processing department to the next processing department during the month?

  Fasb and ifrs standards

How does FASB and IFRS standards differ from on another? If the US adopted the IFRS standards what are the advantages and disadvantages?

  What ways can management accountants adapt

Do you agree with above statement and what ways can management accountants adapt the services they provide to the new environment?

  Choose a well-known publicly traded company

Choose a well-known publicly traded company that none of your other classmates have chosen, and describe the operating segments reported (this information will be in the notes to the financial statements). Include a link to this financial statemen..

  How much indirect factory wages and factory equipment

How much indirect factory wages and factory equipment depreciation cost would be assigned to the Customer Orders activity cost pool?

  Characteristics applies to process costing

Which of the following characteristics applies to process costing but not to job costing?

  Use a selected company or your current work environment to

use a selected company or your current work environment to identify at least one cost or expense that would fit under

  Information about traditional machine hours scheme

Information about Traditional Machine Hours Scheme Topic: Activity Based Costing Resource: Financial and Managerial Accounting for MBA’s

  Prepare the financing activities section

The following information was drawn from the year end balance sheets of Long's Wholesale, Inc.:

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd