A culvert is to be constructed in a bed of sand (e = 0.5) for drainage purposes. The foof of the culvert will be located 3 m below ground surface. Currently the groundwater level is at ground surface. But, after installation of the culvert, the groundwater level is expected to drop 2 m below ground surface. Calculated the change in vertical effective sress on the roof of the culvert after installation. You can assume the sand above the groundwater level is saturated.

Reference no: EM13317538

Questions Cloud

What is the duration of the loan under both methods of : You can obtain a loan for $100,000 at a rate of 10 percent for two years. You have a choice of paying the principal at the end of the second year or amortizing the loan that is, paying interest (10 percent) and principal in equal payments each year. ..
Determine z components of the electric field in a region : An electron has an initial velocity with an x component of zero, a y component of 9.35 km/s, a z component 16.1 km/s, and a constant acceleration of 1.60 x 1012 m/s2 in the positive x direction in a region in which uniform electric and magnetic fi..
What is the linear speed of a point on the rim of flywheel : A flywheel with a diameter of 0.510 m is rotating at an angular speed of 178 rev/min. What is the linear speed of a point on the rim of the flywheel
What is the relationship between duration and the amount of : Maximum Pension Fund is attempting to balance one of the bond portfolios under its management. The fund has identified three bonds that have five year maturities and trade at a yield to maturity of 9 percent
Calculate the change in vertical effective sress on the roof : The foof of the culvert will be located 3 m below ground surface. Currently the groundwater level is at ground surface. But, after installation of the culvert, the groundwater level is expected to drop 2 m below ground surface.
What are the angular velocities : The angular position of a point on the rim of a rotating wheel is given by %u03B8 = 4.01t - 6.34t2 + 2.63t3, What are the angular velocities at t = 3.19 s and t = 6.06 s
Would a consol trading at a yield to maturity : What is a consol bond? What is the duration of a consol bond that sells at a yield to maturity of 8 percent? 10percent? 12percent? Would a consol trading at a yield to maturity of 10 percent have a greater duration than
Find all contact forces to the contacting surfaces : Cylinders A & B weigh 500N each and cylinder C weighs 1000N. Assuming frictionless contact between all surfaces, find all contact forces. Diameters A&B= 1, C=2. Frictionless contact means forces are normal to the contacting surfaces.
What is the mass of the other body : A body of mass 1.2 kg makes an elastic collision with another body at rest and continues to move in the original direction but with 1/7 of its original speed. What is the mass of the other body

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Find the maximum bending stresses wood and steel

Find the maximum bending stresses(wood) and (steel), in the wood and steel, respectively, due to the uniform load if the modulus of elasticity are E (wood)=10 GPa for the wood and E (s)=210 GPa for the steel.

  Determine the gravitational attraction between two spheres

two identical spheres of radius 8 in and weighing 2 lb on the surface of the earth are placed in contact. find the gravitational attraction between them.

  Determine the minimum mean cell residence time

The initial waste concentration is 200 mg/l and the following constants have been determined: Ks=50 mg/l; k=5.0 days^-1; kd=0.06 days^-1; Y=0.60 Determine the minimum mean cell residence time, the mean cell residence time you would set for design.

  Illustrate and annotate the lever system

a wheel barrow is used to lift a 200lb load. the lenght from the wheel axle to the center of the load is 2ft. the length from the wheel and axle to the effort is 5 ft. illustrate and annotate the lever system.

  Annual worth of the project

Use microsoft excel functions to find the net present worth of the project, and the internal rate of return,and the annual worth of the project?

  Determine the azimuth of the line c to d

The coordinates for Point A, Point B and Point C are 5859.28N, 9331.56E and 8501.95N, 7911.60E and 10,500.00N, 8000.00E respectively. An angle right of 220°31'00" is turned when the backsight is B

  What fraction of the flue gas stream would need to be bypass

The company engineer decides that this is too good, that it is not necessary to be this efficient, and proposed that part of the flue gas be bypassed around the electrostatic precipitator so that the recovery of fly ash (particulates) from the flu..

  Determine the quality of the initial state

A two-phase liquid-vapor mixture of water is initially at a pressure of 10 bars. If on heating at fixed volume, the critical point is attained, determine the quality of the initial state.

  Presedimentation-uspended solids concentration of raw revers

Presedimentation can reduce the suspended solids concentration of raw river water from 500 mg/L to 200 mg/L. How many pounds of dry solids does this represent per million gallons?

  How many holes are required to break 250000 tons

Conduct a powder factor design for the following conditions: -Rock is iron ore; density is 5370 lb/cubic yards -Rock swells 60% from in situ when broken -Bench height is 45ft -Drill hole diameter is 12.25 inches

  Can contractor claim that liquidated damages should in limit

Can a contractor claim that liquidated damages should be limited Because of political unrest, only 20% of rooms are occupied. Liquidated damages are set to $30000 per day -> reasonable amount Contractor is late 15 days.

  Gathering the data information

What additional data and information should he gather,and how should he go about gathering the data information ?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd