Calculate the average number in the queue

Assignment Help Operation Management
Reference no: EM13110518

Sid Das Brick Distributors currently employs 1 worker whose job is to load bricks on outgoing company trucks. An average of 24 trucks per 8 hour shift, arrive at the loading platform, according to a Poisson distribution. The worker loads them at a rate of 4 trucks per hour, following approximately the exponential distribution in his service times. Das believes that adding an additional brick loader will substantially improve the firm's productivity. He estimates that a two-person crew loading each truck will double the loading rate from 4 trucks per hour to 8 trucks per hour. Analyze the effect on the queue of such a change and compare the results to those achieved with one worker. Calculate the average number in the queue, average number in the system, average time in the queue, average time in the system, the system utilization rate, and the probability that the system is empty.

Reference no: EM13110518

Questions Cloud

Figure out how to determine gene order : You find two mutations that cause blue wings (b blue is recessive to b+ normal) and spiny bristles (W wiry is dominant to W+ normal). They are linked to this chromosome (pictured). Based on test cross data, complete the map to include these genes.
Null hypothesis-alternative hypothesis-investigative : For the following investigative scenarios, state the null hypothesis, and the alternative hypothesis. Also identify the Type 1 and Type 2 errors which can result based on the hypotheses that you defined.
What is one such mrna sequence : How many DNA and RNA sequences are possible that give you this protein sequence?
Determine probability of completing exam in one hour : Determine the probability that a student will complete the exam in more than 60 minutes but less than 75 minutes? Determine the probability of completing the exam in one hour or less?
Calculate the average number in the queue : Sid Das Brick Distributors currently employs 1 worker whose job is to load bricks on outgoing company trucks. An average of 24 trucks per 8 hour shift, arrive at the loading platform, according to a Poisson distribution.
Explain this paradox : In cells, an enzyme catalyzes the reaction AB --> A + B. However, it was discovered as an enzyme that carries out the reverse reaction A + B --> AB. Explain this paradox.
Rate of return from the new factory : Employing the new factory would ultimately reduce average total cost and the present value of the gain from employing the new factory must be less or equal to $50 million.
Which of the would occur after administration of oubain : Total body sodium content determines extracellular fluid volume, and is regulated by the balance between sodium intake and sodium loss. Oubain is a poison that causes blockage of the Na+/K+ ATPase. Which of the following would occur after administ..
Mean selling time for farm associates : A statewide real estate sales agency, Farm Associates, specializes in selling farm property in the state of Nebraska. Its records indicate that the mean selling time of farm property is 90 days.

Reviews

Write a Review

Operation Management Questions & Answers

  Compare and contrast the following methods of job evaluation

Compare and contrast the following methods of job evaluation, and include examples that are not the same as in the textbook to demonstrate understanding

  Illustrate what are the utilization and efficiency facility

The last event, although forecasted to have 1,000 participants, resulted in the attendance of only 950 participants. Illustrate what are the utilization and efficiency of the conference facility.

  Estimation of economic order quantity

Given the following data for a particular inventory item: Usage 500 units/week Ordering $40 per order Carrying Cost $.01 per unit per week Lead Time 3 weeks Price $.50 per unit

  Choose a product you would create and decide

choose a product you would create and decide whether you would take a slow or fast approach internationalizing your firm.

  Discuss the challenges when launching new product

What are some of the challenges when launching a new product or service that you think you will face and how do you plan to overcome that?

  Illustrate what problems might an organization encounter

Illustrate what problems might an organization encounter in doing AAP that it might not encounter in regular staffing planning.

  Explain how many more searches will it take until the search

Explain how many more searches will it take until the search engine time gets down to 19 min.

  What are the key planning factors for competitive success

What are the key planning factors for competitive success? Provide an example of an organization that has achieved competitive success through planning.

  Provide an analysis of the exporters of mercandise

provide an analysis of the imlication that for the united states may have the fact that those specific countries are top importers and exporters of mercandise

  Calculate total cost for the most economic order size

Company A uses an unstable chemical compound that must be kept in an environment where both temperature and humidity can be controlled.

  Calculate the slope and the intercept of trend equation

Demand for a surgical procedure at St. Use the trend projection method to forecast demand in year 6. Please type only the forecast amount as a whole number by rounding.

  Airlines lose thousands of checked bags every day

Airlines lose thousands of checked bags every day, and America South Airlines is no exception to the industry rule. Over the past 6 weeks, the number of bags "misplaced" on America South flights has been 18, 10, 4, 6, 12, and 10

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd