Calculate ph of buffer solution prepared by mixing water
Course:- Civil Engineering
Reference No.:- EM13298388

Expertsmind Rated 4.9 / 5 based on 47215 reviews.
Review Site
Assignment Help >> Civil Engineering

Calculate the pH of a buffer solution prepared by mixing 8.5g KH2PO4 with 43.5g K2HPO4 in 1 liter of water (this is actually the composition of the dilution water used in a BOD test.

Follow the same procedures you have been using for previous acid/base equilibrium problems, and develop an Excel spreadsheet to identify the pH.

Use alpha derivations.

Put your comment

Ask Question & Get Answers from Experts
Browse some more (Civil Engineering) Materials
First consider highway driving. Assume a constant velocity of 27 m/s (60.4 mph) on level ground. Under these conditions the efficiency of the engine plus auxiliaries is 30 per
Determine a set of a rectangular beam design values b,d and As that will be needed to support a factored bending moment Mu= 450 Kip-ft. Use f'c= 4500 psi and fy= 40000 psi.
Consider a small town in the Phillippines, where the average weight of people is 55 kg, and the average lifespan is 60 years. The people here eat lots of fish due to abundant
A 200 pound man stands at the end of a 16 foot diving board (point C) with a pin at (A) and a roller located 6.695 ft away from A at point (B). The hollow diving board is made
Lab studies have shown that the rate constant associated with the process are as follows: k = 0.95 mg COD/mg VSS-day; Y = 0.48 mg VSS/ mg COD, half-saturation K = 85 mg COD/
Determine the amount of water supplied to the tank, in kg, the final pressure of the air-vapor mixture in the tank, in kPa, and the heat transfer required during the process
A wrought iron water line connecting two reservoirs at 20°C has a length of 1500 m, a diameter of 75 cm, two elbows (90º, long-radius, flanged), a fully open gate valve, and a
estimate the total cost and cost per linear foot for furnushing and driving steel-sheet piling for construction of the basement of a building, 150 by 240 ft. the piles will