Project path A-C-E-J has these activity time estimates in days:

Activity                 Optimistic                   Most Likely                Pessimistic

     A                             3                                  4                                   5

     C                             9                                12                                 14

     E                           12                                15                                 20

     J                              7                                  9                                   9

Compute the expected time or duration for each activity, the variance for each activity, and the expected duration and variance for the path.

Reference no: EM13473082

Questions Cloud

Sketch gantt chart which shows how following five classes : draw a gantt chart that shows how the following five classes can be scheduled into two classrooms a and bnbsp business
Write a 1200 to 1400-word study guide in which you provide : write a 1200 to 1400-word study guide in which you provide a review for the class for the upcoming final on theories
Information from the american institute of insurance : q1.what is sampling error? could the value of the sampling error be zero? if it were zero what would this mean?q2.list
Discuss the actions one might take if they felt that : discuss the actions one might take if they felt that someone was at risk for suicide. do contracts for safety have any
Calculate expected time or duration for each activity : project path a-c-e-j has these activity time estimates in
Please answer the given question describe how particular : please answer the following question. discuss how particular markets such as professional sports or fast food might
The bookstore employee can service 50 students per hour : 1. prepare a master production schedule mps chart using the following information.nbsp weekly demand weeks 1 thru 6 810
A biker traveling with a velocity of 80 feet per second : a biker traveling with a velocity of 80 feet per second leaves a 100 feet platform and is projected directly
Fred federal reserve economic data a database of more than : fred federal reserve economic data a database of more than 3000 u.s. economic time series contains historical data on

Reviews

Write a Review

 

Mathematics Questions & Answers

  How many times is such a line guaranteed to intersect

A function f is continuous on interval [1,3]. A horizontal line is drawn somewhere between the lines y=f(1) and y=f(3). According to the intermediate value theorem, how many times is such a line guaranteed to intersect the graph of f(x)?

  State what was the net price of this merchandise

Merchandise was purchased at list for $3,460 with a single trade discount of 23%. What was the net price of this merchandise?

  You are laying on your back so direction of your force is

a 30 centimeter wrench is attached to a nut. the coordinate system you have picked is such that the wrench lies on the

  What are the dimensions of the block

a new fence is constructed on three sides of a housing block with area 240m^2 the fourth side facing the road is left open. if 52 of fencing is used, what are the dimensions of the block?

  What is the area of the garden in square feet

The length of a rectangular garden is 7 feet longer than its width. If the garden's perimeter is 182 feet, what is the area of the garden in square feet?

  Find the probability that the number selected

Each of the numbers 1 through 10 inclusive has been written on a separate piece of paper. The 10 pieces of paper have been placed in a hat

  How long is a side of the playground

A walkway forms the diagonal of a square playground. The walkway is 24in long. To the nearest tenth of a Meter, how long is a side of the playground?

  Production planning department of graystar prefabricated

production planning department of graystar prefabricated homes company has to decide which types of homes to produce

  How many boxes can she stack in one pile

Betty is stacking boxes at a factory. Each box is 13 (3/4) inches high. The ceiling is 16 feet. How many boxes can she stack in one pile?

  Is there sufficient evidence to refute this claim

The sample results were x= 357.5, s= 117.29. Logger working on the road claims the skidding distance is at least 400 meters. Is there sufficient evidence to refute this claim?

  Complete calculations below using data illustrate all of

the anxiety general stress test angst has been designed to gauge the level of psychological stress management trainees

  Evaluate the amount of work in joules required to empty

The trough is full of water (density (1000 kg/m^3) ). Find the amount of work in joules required to empty the trough by pumping the water over the top. (Note: Use (g=9.8 m/s^2) as the acceleration due to gravity.)?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd