Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Suppose a product must go through an assembly line made up of five sequential operations. The time it takes to complete each operation is normally distributed with a mean of 180 seconds and standard deviation of 5 seconds. Let X denote the cycle time for the line, so that after X seconds, each operation is supposed to be finished and ready to pass the product to the next operation in the assembly line.
a. If the cycle time X = 180 seconds, what is the probability that all five operations will be completed?
b. What cycle time will ensure that all operations are finished 98% of the time?
c. Suppose that the company wants all operations to be completed within 190 seconds 98% of the time. Further suppose that the standard deviation of an operation can be reduced at a cost of $5,000 per second of reduction (from 5), and any or all operations may be reduced as desired by up to 2.5 seconds. By how much should the standard deviations be reduced to achieve the desired performance level, and how much would that cost?
Determine the percentage of idle time that would result if two stations were used and each station was loaded with the worktime shown in Part b(1).
Identify a business that has recently launched a quality improvement initiative (Harley Davidson would be just one of many examples). Your business could be one that is primarily product-providing or one that is primarily service-providing. Do some i..
Share an insight that you learned about yourself related to management readiness. Indicate how specifically you plan to either leverage the insight at present or act on it in the future
Should benching be a matter of concern at Delta and what are the risks involved in moving from a project-centric mode to a mix of projects and products?
Identify and discuss factors that can increase the size and complexity of the information system structure (beyond those discussed in the text).
Setup cost is $60 for a run, and holding cost is $2 per box per month. Hint 1: Setup cost should be treated as ordering cost. Hint 2: Larger time unit is the month and smaller time unit is the day.
Describe the differences between the franchisor and franchisee? How are these differences strategically aligned to create a competitive advantage? What are the three (3) most important factors in determining whether franchising is an appropriate meth..
From the results of the simulation, construct a frequency distribution of demand during lead time.
They put a value on mentoring and coaching." Compare and contrast the concepts of coach and mentor. Is one better suited for a particular situation than the other? What is your experience with coaching and mentoring?
Using a yellow sticky approach (see p. 153), develop a project network for the “Now” Wedding. Create a schedule for the wedding using MS Project. Can you reach the deadline of January 21 for the “Now” Wedding? If you cannot, what would it cost to mak..
You are an independent consultant currently working for Philip Morris. Competitors are alleging that in important developing markets, such as Turkey, Philip Morris created special tobacco blends containing additives that give brands such as Marlboro ..
Define the scope of the project on upgrading a office center in which you have 7 months to complete include the project goals and objectives, deliverables, tasks, costs, deadlines, and expected main staffing and non-staffing resources needed.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd