Analyze the need for waterfall and agile methodologies

Assignment Help Software Engineering
Reference no: EM131373655

Assignment: Waterfall and Agile

Research agile methodologies including SCRUM and extreme programming (XP).

Write a two to three page paper in which you:

1. Explain waterfall methodologies and identify their relationship to the PMBOK process groups.
2. Explain agile methodologies and identify their relationship to the PMBOK process groups.
3. Analyze the need for waterfall and agile methodologies.
4. Explain the advantages of extreme programming (XP) and analyze the advantages of its application in high-budget short-time projects.
5. Explain the factors to consider when selecting a project management methodology (Waterfall vs Agile).
6. Use at least two quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

• Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

• Identify how project management improves the success of information technology projects.
• Use technology and information resources to research issues in IT project management.
• Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Reference no: EM131373655

Questions Cloud

What does the mucous membrane do : What are the different membranes in our body what does the mucous membrane do?
Identify the factor that were important in sourcing strategy : Identify the factors that were important in each sourcing strategy and whether the sourcing decision was strategic for the long term or tactical for the short term. Which strategy did you think was more effective and why?
What is meant by a modulating damper : Can constant-volume fans be used in variable-air-volume systems?
Reporting negative results to be a problem : Do you consider barriers to reporting negative results to be a problem? Why or why not? Please provide 2-3 sentences in your own words to justify your answer.
Analyze the need for waterfall and agile methodologies : Analyze the need for waterfall and agile methodologies. Explain the advantages of extreme programming (XP) and analyze the advantages of its application in high-budget short-time projects.
Treatment of distal fibular fracture without manipulation : Closed treatment of distal fibular fracture without manipulation; the patient was in the postoperative period for an arthroscopy of the shoulder performed two weeks ago; the same physician performed both surgeries?
Experiment was supplied as a gift from a corporation : Finally, blood glucose concentration in the coffee group exhibited a 30 percent decrease compared with that in the water group. In the original paper, the investigators acknowledged that the coffee for the experiment was supplied as a gift from a ..
Explain two of advantages associated with using cable types : Describe one or two of the advantages and/or disadvantages associated with using each cable type for a business's network infrastructure.
What is water contamination : What is water contamination and what causes it? What are the various ways we can remove the contamination to make it viable for human comsumption?

Reviews

Write a Review

Software Engineering Questions & Answers

  In software engineering one can find various life cycle

in software engineering one can find various life cycle models. some examples include the waterfall model agile

  Is there any real harm done by coping software

Would you report a co-worker if you discovered software coping?

  Explain the first three steps of sdlc as we discussed

In your own words, list and explain the first three steps of SDLC as we discussed them in class. Pick an example IT project (you can make something up) and list the results of applying the first three steps to your project.

  Consider the following program segment

Consider test cases  t 1 = ( n  = 3) and  t 2 = ( n  = 5). Although these tour the same prime paths in  printPrimes() , they do not necessarily find the same faults. Design a simple fault that  t 2 would be more likely to discover than  ..

  Describe the use of arrays and subscripts

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

  Produce a plan using a gantt chart

Produce a plan, using a Gantt chart, indicating how you might schedule the work of developing the system. Your schedule should clearly be related to delivering the requirements of ABC Stores plc and should reflect RUP/USDP practice - Explain in wo..

  Prepare a business case for project

Business Case - Using the information that you compiled in the project proposal, prepare a Business Case for this project.

  Benefits rfp in process of purchasing technology

Why do companies use RFPs and what benefits does use of RFP give to process of purchasing technology?

  Business unit resource segregation in organizations

Explain the basic need for and concepts of file / folder permissions and business unit resource segregation in organizations so the company leaders will understand the importance of each.

  How can the negative aspects you mention be overcome

There is no wrong answer here - I want you to seriously consider the positive/negative. How can the negative aspects you mention be overcome?

  Design documentation for a proposed application project

Your assignment is to create initial design documentation for a proposed final application project. Your final project for this class will require building a complete application of your choosing and design in Visual Studio.

  What is a stakeholder and why is such established

1.What is a stakeholder, and why is such established?  2.With regard to gathering requirements, please specify what a requirement is in the context of planning for software development?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd