+1-415-670-9189
info@expertsmind.com
Analyze the impact of the given events on the project
Course:- Project Management
Reference No.:- EM131416238




Assignment Help
Expertsmind Rated 4.9 / 5 based on 47215 reviews.
Review Site
Assignment Help >> Project Management

Assignment: Project Progress

Note: The assignments are a series of papers that are based on the same case, which is located in the Student Center of the course shell. The assignments are dependent upon one another.

During the project life cycle, project risk reviews and reports are required as previously identified in the risk management plan. Two months after the project started, the following events have taken place.

1. The top-two threats have occurred.

2. The top opportunity has been realized.

3. The project's risk budget is already exhausted.

4. The risk management schedule has been shortened by two months.

Write a five to seven page paper in which you:

1. Analyze the impact of those events on the project.
2. Determine if any mitigation activities are required and explain why.
3. Determine if budget / schedule changes are necessary and explain why.
4. Update the risk register and highlight the changes made. Provide the justification for the changes.
5. Use at least four quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

• Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

• Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.




Put your comment
 
Minimize


Ask Question & Get Answers from Experts
Browse some more (Project Management) Materials
The controller would like your advice on the deductibility of the costs of restoration. That is, when can Newform deduct the costs and how much can it deduct? Based on the c
The next day, without knowledge or notice of Bowen's contract with Curd, Ames began construction. Bowen ordered Ames from the premises and refused to allow him to continue.
Critically evaluate the use of complex models of Project Risk and Procurement Management; systematically and creatively making sound judgements based on the systematic analy
Develop a cost of capital for a specific project based on the cost of the capital for another firm which has a similar line of business as the project the manager
Your task is to use Laudon & Laudon's Four-Step Problem-Solving & IS-Building Model and/or the Integrated Framework for Describing and Analyzing Information Systems
Explain the virtual monopoly position that Alcoa enjoyed until World War II: public policy, tariff protection, the failure of Alcoa's few potential competitors, and the limi
Define UML and describe how it fits in the OOAD methodology. Explain how a Use Case is developed and when it is utilized while explaining all components of a Use Case Diagra
Please be explicit about how you derive your results and round to four decimals after the comma - What forward rate does this investor lock in at time 0, through this forward