A flexible manufacturing facility must produce 1680 parts of one type per 80-hour lead (Wortman and Wilson, 1984; Kleijnen and Standridge, 1988). The part flow through the facility is follows.

1. Parts arrive to the facility from a lathe at a constant rate of 21 per hour.

2. Parts require three operations in the following sequence: Op10, Op20, and Op30. 3. A part is washed before and after each operation.

Each operation is performed either by a fixed machine or a flexible machine. A fixed machine can perform one and only one of three operations but a flexible machine can perform any of the three operations. Parts are moved between machines and the wash station by a single automated guided vehicle (AGV). The AGV system transports parts with little or no human assistance. The vehicle picks up loads at designated pick-up points and transports them to designated drop-off points. Each pick-up and drop-off point is associated with a machine or work station. A central computer assigns material movement tasks to the AGV and monitors the vehicle position. The AGV moves in one direction on a fixed track around the center of the system.

Operation processing times are 14.0, 5.0, and 8.0 minutes respectively for Op10, Op20, and Op30. Washing time is 18 seconds.

AGV travel time is 20 seconds around the entire loop. The following table shows AGV travel time between each pair of workstations.

The objective is to find the minimum cost combination of fixed machines (Op10, Op20, or Op30 only) and flexible machines (all three operations) that meets the throughput requirement. Flexible machines cost more than fixed machines. Thus, all possible work should be done by fixed machines. Flexible machines are employed to avoid buying an excessive number of fixed machines. In addition, management is also interested in minimizing lead time for a part. Thus, management will consider a configuration of machines that includes flexible machines and increases cost in order to reduce lead time as long as the total number of machines does not exceed the total number of fixed machines required to do the work by more than one. The following operating rule is employed for each operation to select between fixed and flexible machines. A part will use a fixed machine if it is available. If not, it will use a flexible machine if one is available. If neither a fixed machine nor a flexible machine is available, the part will use the first machine of either type, fixed or flexible, that becomes available.

One possibility that should be considered is using the minimum number of fixed machines needed to process all parts in a timely fashion with no flexible machines utilized.

Assess the structural variability seen in this system. Generate a trace of all system activities. Use the trace to identify the structural variability.

Case Problem Issues

1. What performance measure are important in this problem?

2. How will the AGV system be modeled?

3. Describe how to model the choice between a fixed and a flexible machine for an operation in the simulation language you are using.

4. When does a part entity acquire and free a machine resource relative to acquiring and freeing the AGV resource?

5. How can the effect on system operations of part waiting for the AGV be determined.

6. How many fixed machines of each type are needed if no flexible machines are used? 7. Construct an alternative to the machine configuration in number

6 as follows. Replace one fixed machine of each type with a sufficient number of flexible machines. Determine the number of flexible machines in this case.

8. Why tell why all parts do not have the same time in the system

Reference no: EM131072390

Questions Cloud

When maximizing profit, how much profit will she make : When maximizing profit, how much profit will she make?
Capital budgeting decision on the widget project : After extensive research and development, Your company has recently developed a new Widget and must decide whether to make the investment necessary to produce and marketing it. The widget is superior to current widgets in the marketplace. You are to ..
Can the firm still make a profit : What is the maximum amount the firm could afford to spend on lobbying with the objective of maintaining the monopoly position?
Price the put with binomial trees : Consider a 3-month European put option on a non-dividend-paying stock, where the stock price is $60, the strike price is $60, the risk-free rate is 3% per annum. Stock price will either move up by 10% or down by 5%, every month. Price the put with bi..
A flexible manufacturing facility : A flexible manufacturing facility must produce 1680 parts of one type per 80-hour lead (Wortman and Wilson, 1984; Kleijnen and Standridge, 1988). The part flow through the facility is follows.
Provide an overview of usts business operations : Provide an overview of UST's business operations. In your presentation, feel free to provide visual detail of the type of products UST sells to its customers.
Butterfly spread strategy-calculate the rate of return : First, create a butterfly spread strategy using these options. (1) $190 call priced at $13.07 , (2) $200 call priced at $10.15 and (3) $210 call priced at $8.19. Calculate the rate of return (in %), when the underlying stock price becomes $200. (marg..
Draw the market demand curve faced by this monopolist : Draw the market demand curve faced by this monopolist.
Determine optimal level of short term financing : ATL Constructions is trying to determine the optimal level of short term financing for its working capital requirement. You are asked to provide an analysis on the three key factors that the company should consider in selecting different sources of s..

Reviews

Write a Review

 

Management Theories Questions & Answers

  Discussing the job qualifications and job description

You've been working as a talent specialist at a Manufacturing company for about years 3 years. You recently met with the President of the company, and were asked to hire new office staff. It is your first time meeting the President and you want..

  Aptitude for charismatic leadership

Analysis of your personal aptitude for charismatic leadership. Identify gaps that must be closed in order for you to become more charismatic. The text has many assessments and skill building exercises that you may find helpful in this process. ..

  Case study on asset management in an engineering environment

Case study on Asset management in an engineering environment

  Porter''s five force analysis of social networking industry

Porter's Five Force Analysis of Social Networking Industry in global perspective. Such as consumer power, buyer power, assessment of industry's overall attractiveness & key success factors, threat of new entrants, and so on.

  Leadership varies widely by culture and personality

Leadership varies widely by culture and personality.

  Values-based service brands narratives from ikea

Read the article "Values-Based Service Brands: Narratives from IKEA" by Edvardsson from the readings for this module. Using IKEA as the company in point, conduct research, using the Argosy University online library and the Internet, to better underst..

  How issues vary for product and process innovations

What issues do you think are critical in planning for integration and sharing of information in innovative firm? How do these issues vary for product and process innovations?

  Jobs necessary to realize business goals

To determine the numbers and types of jobs necessary to realize business goals, HR must assess the KSAs available within the organization during a staffing needs analysis. What other factor is necessary to complete the assessment?

  Why were they effective in enabling you to act

Describe an experience when you were enabled to act as a result of the leadership of another leader. How did they enable you to act, and what specific behavior(s) and/or actions contributed to their ability to do so?

  Motivating employees

Motivating Employees

  Information and communications for development

More than one billion people take their electrical and telecommunications systems for granted. However, for billions more, the service-on-demand mentality remains a distant dream and Internet access only a rumor. Recognizing the need to promote gl..

  Objectives be used in the decision-making process

Here is some information about exam. The Midterm Exam covers content from Weeks 1-3 and TCOs A and B. The Exam consists of four essay questions (3 @ 20 points each; 1 @ 50 points) and is worth 110 points of the 1,000 points for the course.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd