A ferry loads cars for delivery across a river

Assignment Help Operation Management
Reference no: EM13720354

A ferry loads cars for delivery across a river and must have a full ferry load of 10 cars. Loading is instantaneous, and the round trip time is an exponential random variable with a mean of 15minutes. The cars arrive at the shore as a Poisson process with a mean of 30/hour. On average how many autos are waiting on the shore at any instant for a ferry?

 

Reference no: EM13720354

Questions Cloud

Develop a mathematical model to derive the throughput : Develop a mathematical model to derive the throughput for this switching network.
Instructor performance evaluation : 1. Applying the John Kotter's Change Model (8 steps) to your selected organization's change situation. Change: Retention should not be part of instructor's performance evaluation.
Required to conduct a systematic : Explain clearly how your underlying Research Philosophy influenced the aforementioned choices - Required to conduct a systematic
A space probe will carry a module of three experiments : A space probe will carry a module of three experiments, with redundant experimental packages within the module. Environmental stress testing has resulted in a reliability estimate over the duration of the mission of 0.85, 0.9, and 0.95. There i..
A ferry loads cars for delivery across a river : A ferry loads cars for delivery across a river and must have a full ferry load of 10 cars. Loading is instantaneous, and the round trip time is an exponential random variable with a mean of 15minutes. The cars arrive at the shore as a Poisso..
Additional information from iverstine and walker : 1. Does Steve need additional information from Iverstine and Walker?1. Does Steve need additional information from Iverstine and Walker?
The time taken to assemble a car in a certain plant : 11) The time taken to assemble a car in a certain plant is a random variable having a normaldistribution of 20 hours and a standard deviation of 2 hours. What is the probability that a car canbe assembled at this plant in a period of time:a. le..
The time it takes to process phone orders in a small florist : The time it takes to process phone orders in a small florist/gift shop is normallydistributed with a mean of 6 minutes and a standard deviation of 1.24 minutes.a. What cutoff value would separate the 2.5% of orders that take the most time topr..
Conducting a tna at capratek : In developing a training program, you might interview subject matter experts (SMEs) to gather data on training needs. This assignment will help you understand how to create strong questions for SMEs, and use the interviews to provide key documenta..

Reviews

Write a Review

Operation Management Questions & Answers

  Illustrate what are design and effective capacities shop

Manager has determined that if 2 additional barbers are hired, shop can accommodate 80 customers per day. Illustrate what are design and effective capacities for barber shop.

  Have any of these companies experiences an evolution of

prepare a document based on credible research and course materials addressing the followingdiscuss the four strategies

  The weekly textbook concepts for our discussion this week

the weekly textbook concepts for our discussion this week arebullmanagement information systemsbullcategories of

  Speed up a floor buffing machine by putting a different

Joseph had an idea that he could speed up a floor buffing machine by putting a different motor on it.

  Reliability and responsiveness boxes are much greater

You have conducted a zone of tolerance analysis for a local car wash. You find that the length of the reliability and responsiveness boxes are much greater than those of the other three service quality dimensions.

  What is the utilization rate of the bartender

assuming that everyone in the bar drank at the same rate and that suzy served people on a first come, first served basis, how long would you expect to have to wait for a drink?

  Elucidate how could survey have been more useful

Using at least two different quality tools, analyze data also present your conclusions. Elucidate how could survey have been more useful. Illustrate what is next step.

  Find the average time in the line

find the new answers to parts (a) to (e). Please show the work because I need to understand it and show what I did to receive credit.

  Three-period moving average

Weekly sales of copy paper at Cubicle Suppliers are in the table below. Forecast week 8 with a three-period moving average

  Calculate the schedule variance and cost performance index

A project to build a new bridge seems to be going very well since the project is well ahead of schedule and costs seem to be running very low.

  Formulate business-level corporate also global strategies

Formulate also implement business-level corporate also global strategies. Compose, prepare also recommend strategies to achieve also sustain competitive market profile.

  What information can be sought and gained to monitor

what information can be sought and gained to monitor effectiveness of any continuous improvement efforts?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd