+1-415-670-9189
info@expertsmind.com
2012 olympic games - was this a successful project
Course:- Project Management
Reference No.:- EM13693302





Expertsmind Rated 4.9 / 5 based on 47215 reviews.
Review Site
Assignment Help >> Project Management

Read about the 2012 Olympic Games

- Was this a successful project?

- Were there any drawbacks?

- Who was responsible?

- List stakeholders and assess risk.

Answered:-

Verified Expert


Preview Container content

On the public transport front, London Olympics was overall a success with some niggles along the way as reported in The Independent (2012). The niggles were of the London Tube breaking down a few times and an anti-Games lane protest carried out by the taxi drivers. Here the stakeholder responsible for the London Tube break downs is Transport for London, the managing authority for transportation in London city. Such discrepancies poses a risk of a negative image of the city in the minds of the visitors.




Put your comment
 
Minimize


Ask Question & Get Answers from Experts
Browse some more (Project Management) Materials
Fit a linear trend equation to the time series. Using this equation, determine the trend estimate for 2010.- Fit a quadratic equation to the time series, then use the equation
Acme Corporation has recently given out a nine-month contract to a construction subcontractor. What can Acme Corporation do about this? Explain how you would resolve this issu
How important is it for a project manager running an IT project to have technical skills in the technology being used in the project he or she is running? Explain. What are
Contrast and compare three project management models in use today. Note: The models may contain substantively different terms for the identical component. Prepare an analysi
MGMT 404- Why do you think configuration management and project change control are difficult to perform in the middle of a complex software development project, such as thos
Company B-Annual salary of $46,000, a cafeteria plan under which employ- ees can choose benefits of up to 10% of annual salary or take the cash equivalent. In addition, the
A charge of 25 nC is uniformly distributed along a circular arg (radius = 2 m) that is subtended by a 90 degree angle. What is the magnitude of the electric field at the cen
Read Case Study: Project Management at Dotcom.com. Dotcom.com is a software engineering and systems development consulting firm that needs some organizational improvements i